Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Sat May 4 16:50:05 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Side View; Small TB; 2nd Sitting; Outside of Train; Standing;
Entry# 5103699-0
Side View; Small TB; EOG/SLR; Outside of Train; Standing;
Entry# 5103699-0

01036⇒01036XX/Mysuru - Dadar Central Sharavati Special
मैसूरु - दादर सेन्ट्रल (शरावती) विशेष

MYS/Mysuru Junction (Mysore) --> DR/Dadar Central

Latest News
(You need to double-check/verify this info yourself)
Normal operation of regular train resumes
Thu Nov 25, 2021 (03:06PM)
News History
0 Follows
Bedroll/Linen: Don't know change
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✕ E-Catering
TRAIN IS CANCELLED
Dep:
Arr:
Rating: 3.8/5 (6 votes)
cleanliness - average (1)
punctuality - good (1)
food - poor (1)
ticket avbl - excellent (1)
railfanning - excellent (1)
safety - excellent (1)
ICF Rake

Rake/Coach Position

  0
  L
  1
DL2
  2
 D1
  3
 S1
  4
 S2
  5
 S3
  6
 S4
  7
 S5
  8
 S6
  9
 S7
 10
 S8
 11
 B3
 12
 B2
 13
 B1
 14
 A1
 15
 D2
 16
 D3
 17
DL1
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train News

Page#    5 News Items  

Rail News
180775 views
0

Feb 22 2021 (18:06)
irifan2015~
irifan2015~   2331 blog posts
Re# 4877712-1              
As per TT circulated earlier, it was supposed to reach UBL by 1100. But now it is not so. Why slower TT?
Translate to English
Translate to Hindi

180909 views
0

Feb 22 2021 (18:12)
sachinature~
sachinature~   8571 blog posts
Re# 4877712-2              
I think after Ubl yard remodeling, it is reaching Ubl after 07318 now at 12:20
click here
click here
Translate to English
Translate to Hindi
Feb 12 2021 (07:41) Railways to run weekly special Mumbai-Mysuru train (m.timesofindia.com)
New/Special Trains
CR/Central
39803 views
0

News Entry# 438600   
  Past Edits
This is a new feature showing past edits to this News Post.
MUMBAI: Railways has decided to run an additional weekly special train (01035/01036) between Mumbai and Mysuru from February 11.
...
Revised dates of Commencement of Additional Special Trains between Mumbai – Mysuru and Mumbai - Puducherry
...
Feb 09 2021 (08:42) Additional Weekly Special Train between Mumbai and Mysuru via Pune Route (www.punekarnews.in)
New/Special Trains
CR/Central
73228 views
5

News Entry# 437968   
  Past Edits
This is a new feature showing past edits to this News Post.
Pune, 8 February 2021: Railways will run additional weekly special train between Mumbai and Mysuru Jn  as per details given below:
...

1 Public Posts - Tue Feb 09, 2021

56173 views
0

Feb 09 2021 (21:49)
sachinature~
sachinature~   8571 blog posts
Re# 4871320-2              
After speeding of this train between Dr and Ubl. 07318 TT is not of good use now. This train overtakes it before UBL.
Translate to English
Translate to Hindi

48458 views
1

Feb 10 2021 (18:02)
irifan2015~
irifan2015~   2331 blog posts
Re# 4871320-3              
With Chalukya and Sharavati starting, we have few peculiar situations:
1. Two daily trains between Mumbai and Hubli within one hour gap and second train overtakes the first.
2. Two daily trains between Mumbai and Bangalore within one hour gap and second train is faster by 2 hours.
3. Two trains between Mumbai and Thirunelveli within one hour gap on 4 days
...
more...
a week.
4. Two trains between Mumbai and Villupuram within one hour gap on 2 days a week.
5. Two trains between Mumbai and Katpadi within one hour gap on 4 days a week and no trains on other 3 days.
6. Hubli to Bangalore takes 10 hours, 3 hours more than normal.

Translate to English
Translate to Hindi

52186 views
0

Feb 10 2021 (19:03)
sachinature~
sachinature~   8571 blog posts
Re# 4871320-4              
Early departure for Dr-Ubl exp will be good now. 6 PM from Dr and arriving UBl by 8-9 am. Also now Goa slip to Ubl stands cancelled, which was another alternative before from Pune to Dwr/Ubl. This can cover up, win-win scenario for both Chalukya and Ubl exp.
Translate to English
Translate to Hindi

Rail News
48198 views
1

Feb 11 2021 (09:53)
Atmathew58~
Atmathew58~   140 blog posts
Re# 4871320-5              
There are too many trains at the same time, and this train is very slow. Time to reach Bangalore/Mysore from Dadar is the same despite doubling of track
Translate to English
Translate to Hindi

49091 views
0

Feb 12 2021 (18:09)
irifan2015~
irifan2015~   2331 blog posts
Re# 4871320-6              
I would suggest like this: Start Chalukya by 1800 to cross UBL by 0700 and reach SMVB (bypassing YPR) by 1430 . Further, Katpadi by 1800 and PDY 2145. TEN train Salem by 1930, Madurai by 0030, TEN 0430. Return start from TEN by 1630/ PDY 2300 to reach SMVB 0800 and UBL 1530 and DR 0530.

Start UBL express by 2130 to reach UBL by 1100. Return start by 1700 to reach DR by 0730. If terminal problem is there at Mumbai, shift one of the train to LTT. If
...
more...
found successful, this can get extended upto Bangalore to reach by 1830/ leave by morning 0900.

Translate to English
Translate to Hindi
Page#    5 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy