In 2023-24 the LHB coaches Target is 5000 coaches and train set 2000 coaches making Total 7000 coaches. In 2024-25 the target is 7700 coaches. In future in place of LHB coaches they will shift to manufacture more VB sets. I have attached the coach production plan.