SWR should think of linking Cantonment/ JTJ line with PF 8-10 (atleast PF 8) and YPR line to pf 1-7 (atleast PF 5 to 7). I feel JTJ line to PF 8 seems practically possible. This will give lot of flexibility in operations. Partial work can be planned during the lock down period.