There are enough morning trains to MYS. There should be logic to extend with suitable TT. All morning extensions were to clear SBC not as demand trains (GG, Basava, Hampi). If needed, Bidar ypr or one of the Hyb/ kcg should get extended to MYS, thereby providing connectivity