So how come u say CBE RJT cant get E loco ? With allotment in RPM rising up. AJJ have been given the locos of RPM as well. SR is getting a handful of E locos.
Once GTL ELS is commissioned , it can be done very easily. I'm very much aware of loco usage of SR trains. SR is rated as the worst in terms of loco usage as well. The earlier plan was to run E loco all the way till CSTM with D loco hauling in Daund to Wadi with E loco as dead for all Mumbai Chennai trains. The plan has been paused for a while.