What would be the ten important , priority works new govt needs to take up for karnataka?
Can we enlist them?
Few according to me are
1. Sbc mys doubling electrification at the earliest with increase in mps between kgi mys.
2....
more... Bangalore sub urban network on existing tracks by doubling sbc hsra, ynk csdr , etc.
3. Tk dvg new electrified line. With connection to bay.
4. Belgaum pune track straightening.
5. Talaguppa honnavara new line.
6. Chikballapur sspn or dmm new line, cut shorts sbc sur by 80 to 90 kms.
7. Kolar madanpalle new line, cut shorts sbc tpty distance by 80 90 kms.
8. Sbc majn doubling between hassan and majn , allowing six pairs of oassenger trains daily.
9. Majn to be included under swr .
10. Cmnr nilambur new line.