Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

चलती है (ग्वालियर-भोपाल वाया गुना बीना ICE) उड़ती है धूल जलते है दुश्मन खिलते है फूल - Adi Singh

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Sun Jun 13 20:44:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Post PNRAdvanced Search

CGY/Changanassery (4 PFs)
ചങ്ങനാശ്ശേരി     चन्गनाशेरी
[Changanacherry]

Track: Double Electric-Line

Show ALL Trains
Changanassery Byepass, Vazhoor Road,Changanassery, Kottayam Ph: 0481- 2420108
State: Kerala


Zone: SR/Southern   Division: Thiruvananthapuram (Trivandrum)

No Recent News for CGY/Changanassery
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 4
Number of Halting Trains: 46
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 3.8/5 (24 votes)
cleanliness - excellent (3)
porters/escalators - average (3)
food - average (3)
transportation - excellent (3)
lodging - average (3)
railfanning - good (3)
sightseeing - good (3)
safety - excellent (3)
Show ALL Trains

Station News

Page#    Showing 1 to 20 of 29 News Items  next>>
Jun 19 2019 (10:38) Speed curbs lifted in three rail corridors (www.thehindu.com)
New Facilities/Technology
SR/Southern
0 Followers
41994 views

News Entry# 384596  Blog Entry# 4346876   
  Past Edits
Jun 19 2019 (10:38)
Station Tag: Tiruvalla/TRVL added by 12649⭐️ KSK ⭐️12650^~/1203948

Jun 19 2019 (10:38)
Station Tag: Changanassery/CGY added by 12649⭐️ KSK ⭐️12650^~/1203948

Jun 19 2019 (10:38)
Station Tag: Thrippunithura/TRTR added by 12649⭐️ KSK ⭐️12650^~/1203948

Jun 19 2019 (10:38)
Station Tag: Angamaly for Kalady/AFK added by 12649⭐️ KSK ⭐️12650^~/1203948
Railways have withdrawn speed restrictions imposed in three corridors to improve operations and punctuality of trains.
With the easing of the speed curbs imposed by the Commissioner of Railway Safety and the Railway Board, locomotives can now haul trains at 80 kmph on the up and down lines of the Angamaly station, 45 kmph on the 400-metre stretch near Thripunithura, and 80 kmph in 4.3 km along the Changanacherry-Thiruvalla section.
“The speed restrictions prevailing in these corridors were 15 kmph, 20 kmph, and 15 kmph respectively. The easing of the speed
...
more...
restrictions and allowing trains to run at the sanctioned sectional speed have resulted in mail and express trains saving up to half-an-hour and improving punctuality,” Divisional Railway Manager, Thiruvananthapruam, Shirish Kumar Sinha told The Hindu.
The restrictions had been imposed while laying the tracks or when the track renewal works were undertaken. The speed on the 400-m stretch near Thripunithura in the Kayamkulam- Kottayam- Ernakulam corridor will be enhanced to 60 kmph in two months.
The authorities are upbeat that the punctuality of trains had gone up to 75% and have fixed 80% for December. Trains are running at 100 kmph in the Thiruvananthapuram Central-Kayamkulam corridor and 80 kmph in the Ernakulam-Shoranur and the Thiruvananthapuram Central-Shoranur corridors. The DRM said complaints from commuters on the late running of trains had come down drastically.
“We have identified another 10 speed cautions in the State and attempts are on to remove the restrictions this year itself,” Mr. Sinha said. If the restrictions cannot be withdrawn fully, speed would be enhanced to improve operations.
ചിങ്ങവനം ചങ്ങനാശേരി റെയിൽവേ സ്റ്റേഷനുകൾക്കിടയിൽ അതിവേഗ ട്രയൽ റൺ

എറണാകുളം-കോട്ടയം-കായംകുളം റെയിൽവേ റൂട്ടിൽ ചിങ്ങവനം - ചങ്ങനാശേരി സ്റ്റേഷനുകൾക്കിടയിൽ നിർമ്മാണം പൂർത്തിയായ രണ്ടു വരി പാതയുടെ സുരക്ഷാ പരിശോധനയുമായി ബന്ധപ്പെട്ട് കമ്മീഷണർ ഓഫ് റെയിൽവേ സേഫറ്റി, ദക്ഷിണ മേഖല, ബാംഗ്ളൂർ. നാളെ (ഡിസംബർ 7, 2018 വെളളിയാഴ്ച്ച) ഉച്ചക്ക് രണ്ടുമണിക്കും അഞ്ചുമണിക്കും ഇടയിൽ അതിവേഗ പരീക്ഷണ ഓട്ടം നടത്തുന്നു. കോട്ടയം ജില്ലയിലെ ചിങ്ങവനം - ചങ്ങനാശേരി റെയിൽവേ സെക്ഷനുകൾക്കിടയിൽ പൊതു ജനങ്ങൾ, ലെവൽ ക്രോസ് ഉപയോക്താക്കൾ എന്നിവർ ജാഗ്രത പുലർത്തണം, അനുവാദമില്ലാതെ റെയിൽവേ ലൈനിലും പരിസരങ്ങളിലും ജോലി ചെയ്യുകയോ ട്രാക്കിൽ പ്രവേശിക്കുകയോ ചെയ്യരുത്.
Dec 06 2018 (12:13) Chingavanam double line to open soon (www.thehindu.com)
New Facilities/Technology
SR/Southern
0 Followers
22490 views

News Entry# 370899  Blog Entry# 4073347   
  Past Edits
Dec 06 2018 (12:13)
Station Tag: Ettumanur/ETM added by 12649⭐️ KSK ⭐️12650^~/1203948

Dec 06 2018 (12:13)
Station Tag: Kuruppanthara/KRPP added by 12649⭐️ KSK ⭐️12650^~/1203948

Dec 06 2018 (12:13)
Station Tag: Changanassery/CGY added by 12649⭐️ KSK ⭐️12650^~/1203948

Dec 06 2018 (12:13)
Station Tag: Chingavanam/CGV added by 12649⭐️ KSK ⭐️12650^~/1203948
Safety inspection of Changanassery-Chingavanam stretch
The much-awaited commissioning of the double line section between Changanassery and Chingavanam in Kottayam is set to take place before Christmas with the Commissioner of Railway Safety (CRS) slated to inspect the stretch soon.
Officials said here on Monday that construction of the 10-km stretch was almost complete except the signalling work, which could be taken up after the inspection by the CRS. With this trains would be able to cut down on the running time by 10 minutes in the Ernakulam-Kottayam-Kayamkulam section.
“The
...
more...
preliminary inspection will be followed by a statutory inspection of electrification and speed trial. Once the CRS accords authorisation, the Railway Board will decide on the date of commissioning,” said a senior railway officer.
While the constructed speed of the section is 110 km per hour, the department expects the CRS to approve a maximum speed of up to 90 km per hour.
“The section speed could be raised at a later stage based on the annual track report by the CRS and by evaluating the weather conditions,” the official added.
Kuruppanthara
Meanwhile, doubling work on the 8-km stretch between Kuruppanthara and Ettumanur has entered the second stage with Railways already completing the signalling integration work with the opening of an additional platform at the Ettumanur station.
The second phase of work, which focusses on connectivity, is expected to be completed in a couple of months and the stretch will be opened to traffic by March.
With this, doubling will be completed in around 97 of the total 115-km Ernakulam-Kottayam-Kayamkulam section.
Running time
The completion of track doubling work in the Kottayam section is crucial for introducing new trains and cutting down on running time.
However, the doubling of the 19-km Chingavanam-Ettumanur section is slated to extend well beyond the target date of March 2020 owing to a dispute over imposition of Income Tax on the compensation for land acquisition.
Railways seek to take over four hectares of land from 200 property owners spread across three villages for setting up a second line along the stretch.

20414 views
Dec 06 2018 (12:29)
Railway Fan~   5409 blog posts
Re# 4073347-1            Tags   Past Edits
Whenever any doubling or electrification was done, all newspaper reports used to say that running tine will be cut down.But even after all that being done, ironically running time has kept on increasing and no significant benefit has happened for passengers
Dec 04 2018 (22:17) ചിങ്ങവനം– ചങ്ങനാശേരി രണ്ടാം റെയിൽ പാതയിൽ പരീക്ഷണ ഓട്ടം 7ന് (www.manoramaonline.com)
Other News
SR/Southern
0 Followers
14514 views

News Entry# 370787  Blog Entry# 4069146   
  Past Edits
Dec 04 2018 (22:17)
Station Tag: Chingavanam/CGV added by MCPNBR~/261443

Dec 04 2018 (22:17)
Station Tag: Changanassery/CGY added by MCPNBR~/261443
Stations:  Changanassery/CGY   Chingavanam/CGV  
ചിങ്ങവനം– ചങ്ങനാശേരി രണ്ടാം റെയിൽ പാതയിൽ പരീക്ഷണ ഓട്ടം 7ന്
കൊച്ചി∙ ചിങ്ങവനം– ചങ്ങനാശേരി രണ്ടാം റെയിൽ പാതയിൽ മുഖ്യസുരക്ഷാ കമ്മിഷണറുടെ (സിആർഎസ്) പരിശോധനയും പ്രത്യേക ട്രെയിൻ ഉപയോഗിച്ചുളള പരീക്ഷണ ഓട്ടവും 7ന് നടക്കും. വൈകിട്ട് 3.30 മുതൽ 3.45 വരെ പരീക്ഷണ ഒാട്ടം നടക്കുന്ന സമയത്തു പുതിയ പാതയിൽ പാളം മുറിച്ചു കടക്കാതെ ജാഗ്രത പാലിക്കണമെന്നു റെയിൽവേ അറിയിച്ചു. മാസങ്ങൾക്കു മുൻപ് നിർമാണം പൂർത്തിയായെങ്കിലും സിആർഎസ് പരിശോധനയ്ക്കാവശ്യമായ രേഖകൾ ലഭ്യമാക്കാൻ ദക്ഷിണ റെയിൽവേ അധികൃതർക്കു കഴിയാതിരുന്നതാണു പരിശോധന വൈകിച്ചത്. പാത തുറക്കുന്നതോടെ തിരുവനന്തപുരം മുതൽ ചിങ്ങവനം വരെ പൂർണമായും ഇരട്ടപ്പാതയാകും. കോട്ടയം വഴിയുളള പാതയിൽ തിരുവനന്തപുരത്തിനും എറണാകുളത്തിനുമിടയിൽ ചിങ്ങവനം മുതൽ കുറുപ്പന്തറ വരെ (27 കിലോമീറ്റർ) ദൂരം മാത്രമാണു ഇനി ഇരട്ടപ്പാതയാകാൻ ബാക്കിയുളളത്.എറണാകുളം– കായംകുളം ( കോട്ടയം വഴി–114 കിലോമീറ്റർ) പാത ഇരട്ടപ്പിക്കൽ 2003ൽ
...
more...
അന്നത്തെ റെയിൽവേ മന്ത്രി നിതീഷ് കുമാറാണ് ഉദ്ഘാടനം ചെയ്തത്. ചിങ്ങവനം ചങ്ങനാശേരി (9 കിലോമീറ്റർ) പാത കൂടി തുറക്കുന്നതോടെ 114ൽ 87 കിലോമീറ്റർ ഇരട്ടപ്പാതയാകും.കോട്ടയം ജില്ലയിൽ മൂന്നര ഹെക്ടർ ഭൂമി കൂടി പാത ഇരട്ടിപ്പിക്കലിന് സർക്കാർ ഏറ്റെടുത്തു കൈമാറാനുണ്ട്. ഇപ്പോൾ പാത ഇരട്ടിപ്പിക്കൽ പുരോഗമിക്കുന്ന കുറുപ്പന്തറ–ഏറ്റുമാനൂർ (8 കിലോമീറ്റർ) റീച്ച് 2019 ഫെബ്രുവരിക്കു മുൻപു കമ്മിഷൻ ചെയ്യാനാണു റെയിൽവേ ശ്രമിക്കുന്നത്.
Apr 03 2018 (14:22) Double line through Kottayam by 2020 (www.thehindu.com)
Other News
SR/Southern

News Entry# 333363   
  Past Edits
Apr 03 2018 (14:27)
Station Tag: Eraniel/ERL added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Kanniyakumari/CAPE added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Nemom/NEM added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Shoranur Junction/SRR added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Ambalappuzha/AMPA added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Harippad/HAD added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Alappuzha (Alleppey)/ALLP added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Changanassery/CGY added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Chingavanam/CGV added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Ettumanur/ETM added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Kuruppanthara/KRPP added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Kayamkulam Junction/KYJ added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Kottayam/KTYM added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Ernakulam Junction (South)/ERS added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Thiruvananthapuram Central (Trivandrum)/TVC added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:27)
Station Tag: Mangaluru Junction (Mangalore)/MAJN added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:22)
Station Tag: Mangaluru Central (Mangalore)/MAQ removed by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147

Apr 03 2018 (14:22)
Station Tag: Mangaluru Central (Mangalore)/MAQ added by 16229🔹Mysuru↔️Varanasi Express🔹16230^~/36147
Double line along the busy 620-km Mangaluru Junction-Thiruvananthapuram Central corridor will become a reality in 2020 with the completion of the remaining 38 km in the Ernakulam-Kottayam-Kayamkulam section in two years. Railways will complete the work once the State made the land available, General Manager of Southern Railway R.K. Kulshreshta said here.
Mr. Kulshrestha, who was here to inspect the railway facilities and the performance of the Thiruvananthapuram railway division, said Chief Secretary Paul Antony had promised to expedite land acquisition.
Of the four blocks to be doubled, the Kuruppanthura-Ettumanur and Chingavanam-Changanassery stretch
...
more...
will be completed this year. The other two blocks — Ettumanur-Kottayam and Kottayam-Chingavanam — are scheduled for completion by 2020. The dilemma of tunnels, which had been delaying the work, has been solved with Railways deciding to go for rail overbridge.
In the coastal line via Alappuzha, the 87-km Haripad-Ernakulam line is single. The 18-km double line from Haripad to Ambalappuzha will be completed next year. A decision on the doubling of the remaining stretch from Ambalappuzha to Ernakulam is yet to be taken as Railways are demanding cost-sharing of the project.
The General Manager said the sanctioned third line between Shoranur and Ernakulam could be completed within three years of handing over land. The State had been informed of the urgency of acquiring land for doubling of the Thiruvananthapuram Central-Kanyakumari section and development of a coaching terminal at Nemom as doubling from Kanyakumari to Eraniel had commenced.
“We have already sought the land needed for doubling up to Nemom and for the coaching terminal for which Rs. 73 crore has been allocated. The proposal for the land from Nemom to Parassala will be submitted in two months. The Chief Secretary has promised to include it in the fast track project,” the General Manager said.
Page#    Showing 1 to 20 of 29 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy