Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

Start RailFanning NOW, learn to live - before you run out of time - Varun

Full Site Search
  Full Site Search  
Just PNR - Post PNRs, Predict PNRs, Stats, ...
 
Mon Jun 27 23:58:23 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Advanced Search
<<prev entry    next entry>>
News Entry# 487461
May 27 (22:32) New terminal a traffic bane? (bangaloremirror.indiatimes.com)
New Facilities/Technology
SWR/South Western
0 Followers
22971 views

News Entry# 487461  Blog Entry# 5358904   
  Past Edits
May 27 2022 (22:32)
Station Tag: SMVT Bengaluru/SMVB added by Rail Fanning/718429
Stations:  SMVT Bengaluru/SMVB  
Posted by: RFIR~ 522 news posts
After a delay of over a year, the Sir M Visvesvaraya Terminal in Byappanahalli is all set for a grand opening on
June 6. While the news of the inaugural has been a celebration for rail enthusiasts, Bengalureans around the area
worry about rising traffic congestion in future.
However, the South Western Railways noted that only three pairs of trains would be running for
...
more...
now, with an
expected footfall of less than 5,000.
“There will be traffic once the terminal will be opened. The engineer of the ndian Oil Corporation (IOC) flyover
hadn’t planned for this railway terminal.
Now it’s only two lanes but it should have been at least a three-lane flyover. Unless the flyover is widened, there
will be a major bottleneck.” said a resident, Jude Rajesh.
“People coming from Kammanahalli or Banaswadi usually want to reach the Banaswadi flyover. Without the
adequate infrastructure, the footfall from even one train will cause a jam on the road. Each train will contain at
least 1,400 passengers and it’s going to be a nightmare. Even if only 50 per cent want to go North or East
Bengaluru, 700 people will be scurrying to catch cabs and private vehicles,” said another resident of the area,
Dev Anand.
On condition of anonymity, another resident aired accessibility concerns. “The terminal is a great move, but the
question is how they are they going to manage incoming and outgoing traffic? It should not be a case where
people have to miss trains. The whole idea for another terminal is to decongest the city but they have to get the
logistics right.
New terminal a traffic bane?
East Bengaluru will be most hit if traffic congestion begins there. Some alternate arrangements should have been
made to facilitate the free flow of traffic, said Rajashekar, a resident.
Speaking to BM, SWR PRO, Aneesh Hegde said, “One round of expansion of the main road in front of the
terminal connecting Old Madras roadside to Banaswadi side has already been done. Right now, we are only
shifting three pairs of trains and so the traffic in front of the traffic will be minimal. Each train will get around
800-900 passengers.”
To reduce the possible traffic congestion, BBMP has made some immediate and long-term plans as well.
The IOC flyover needs to be widened to prevent traffic congestion
–Jude Rajesh, a resident
“The railway station that will see at least one lakh footfall in full capacity that needs to be supplemented with
adequate infrastructure. Currently, the terminal lacks a mobility plan. As an immediate measure, we can
complete a 50-75 metre L-shaped road by using railway land to facilitate commuters from Maruthi Seva Nagar
to reach Banaswadi and the railway overpass has been completed.
“For long term decongestion, we have made some plans; for 1 lakh footfall, you need at least 80-100 feet road.
Adjoining the railways, there are three modes: railway lines, suburban rail, and elevated flyover traffic. We need
to find a solution to connect all of them with minimal land acquisition,” said BS Prahalad, Chief Engineer (Road
and Infrastructure), BBMP.
According to him, BBMP has proposed the Elevated Rotary overpass similar to the Chennai model at a proposed
cost of Rs 250 crore. It took six months to come up with this idea and is not yet in the action plan. We have also
proposed a travelator connecting the railway terminal to Vivekananda Metro station, he said

More Posts
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy