Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Wed Sep 18 10:17:49 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 550067
Apr 27 (12:13) Automatic Signaling System Improves Train Efficiency on South East Central Railway
IR Affairs
SECR/South East Central
310243 views
3

News Entry# 550067   
  Past Edits
Apr 27 2024 (12:13)
Station Tag: Sarona/SZB added by AdittyaaSharma^~/1421836

Apr 27 2024 (12:13)
Station Tag: Kumhari/KMI added by AdittyaaSharma^~/1421836

Apr 27 2024 (12:13)
Station Tag: Gatora/GTW added by AdittyaaSharma^~/1421836

Apr 27 2024 (12:13)
Station Tag: Bilaspur Junction/BSP added by AdittyaaSharma^~/1421836

Apr 27 2024 (12:13)
Station Tag: Raipur Junction/R added by AdittyaaSharma^~/1421836
अच्‍छी खबर: रेलवे के इस सिस्‍टम से अब ट्रेनें नहीं होंगी लेट, आने वाले दिनों में रेल यात्रियों की परेशानी होगी दूर

The South East Central Railway has installed an automatic signaling system on the Kumhari-Sarona and Bilaspur-Gatora sections to enhance train efficiency and reduce delays and accident risks. This system allows multiple trains to operate on the same track, decreasing passenger train delays and improving traffic management. The system enables more trains...
more...
to operate on the same track segment, accommodating up to four, five, or six trains based on the distance between stations. This approach eliminates the need for new stations and reduces maintenance costs. The railway completed the installation of 14 kilometers of automatic signaling in April 2024, including Kumhari-Sarona (7 km) and Bilaspur-Gatora (7 km). With this project, the automatic signaling system from Nagpur to Sarona is fully operational. The system between Sarona and Raipur is expected to be completed within the next three months. This automation will benefit the South East Central Railway by reducing passenger train delays caused by heavy freight traffic, enabling multiple trains to operate within a single block section, and enhancing the implementation of safety systems like Kavach and the centralized traffic control system.

South East Central Railway ne Kumhari-Sarona aur Bilaspur-Gatora sections pe automatic signaling system laga diya hai, jisse train ka efficiency badhega aur delay aur accidents ka risk kam hoga. Is system se ek hi track pe multiple trains aasani se chal sakengi, jisse passenger trains ki delay kam hogi aur traffic...
more...
management badhega. Ye system ek hi track section pe zyada trains chala sakta hai, jisme do stations ke beech ki distance ke hisab se 4, 5 ya 6 trains chal sakti hain. Isse new stations banane ki zaroorat nahi hai aur maintenance ka kharcha bhi kam hota hai. Railway ne April 2024 me 14 kilometers automatic signaling ka kaam pura kiya hai, jisme Kumhari-Sarona (7 km) aur Bilaspur-Gatora (7 km) shamil hain. Is project se Nagpur se Sarona tak automatic signaling system fully operational ho gaya hai. Sarona se Raipur tak ka system next three months me complete ho jayega. Ye automation South East Central Railway ko benefit dega kyunki heavy freight traffic ki wajah se passenger trains ki delay kam hogi, ek hi block section me multiple trains chal sakengi, aur safety system like Kavach aur centralized traffic control system ko implement karne me madad milegi.

8 Posts

43752 views
4

Apr 29 (10:44)
SGRFC^~
SGRFC^~   2761 blog posts
Re# 6045597-9              
1 compliments
Useful
डीएफसी नही,पूरे मुंबई से हावड़ा तक वाया भुसावल,नागपुर,गोंदिया, दुर्ग, रायपुर,बिलासपुर,झारसुगुड़ा ,खरगपुर में 6 लाइने बचाई जाए । 2 लाइन में पैसेंजर ट्रेनें और 4 लाइन में गुड्स ट्रेनें चले।
Translate to English
Translate to Hindi

122187 views
1

Apr 29 (11:24)
SGRFC^~
SGRFC^~   2761 blog posts
Re# 6045597-10            Tags   Past Edits
TRAIN LATE SOLUTION
NEED 6 RAILWAY LINES FROM MUMBAI TO HOWRAH VIA MANMAD, BHUSAVAL,NAGPUR,GONDIA,DURG,RAIPUR, BILASPUR, JHARSUGUDA,TATANAGAR, KHARAGPUR,SO THAT PASSENGER AND FREIGHT TRAINS CAN RUN ON TIME
पैसेंजर और गुड्स ट्रेनों के समय पे चलाने के लिए कृपया मुंबई से हावड़ा via मनमाड़,भुसावल,नागपुर, गोंदिया, दुर्ग, रायपुर, बिलासपुर, झारसुगुड़ा, टाटानगर,खरगपुर तीसरी,चौथी,पांचवी, छठवी लाइन बिछाई जाए ,टोटल 6 लाइने बिछाई जाए।
click here
Translate to English
Translate to Hindi

42827 views
3

Apr 29 (17:46)
Desi.Rail~
Desi.Rail~   3105 blog posts
Re# 6045597-11              
1 compliments
Agree:6 lines for all
Dankuni - Andul - Kharagpur - Tatanagar - Jharsuguda - Rourkela - Bilaspur - Raipur (4 freight lines + 2 passenger train lines is required)
Raipur - Durg - Nagpur (3 freight lines + 2 passenger train lines is required)
Nagpur - Sevagram/Wardha (2 freight + 2 passenger train lines required)
Wardha - Bhusaval - Jalgaon - Manmad - Igatpuri -
...
more...
Kalyan (3 lines required for combined operations of passenger and freight trains)

Translate to English
Translate to Hindi

130407 views
1

Apr 29 (21:27)
SGRFC^~
SGRFC^~   2761 blog posts
Re# 6045597-12            Tags   Past Edits
1 compliments
Agree
Need 4 railway lines from katni to bilaspur ,Jabalpur to gondia ,gondia to balharshah, Champa to gevra road, anuppur to ambikapur; 3 lines from Mandla fort to Nainpur,Nainpur to chhindwara, chhindwara to Nagpur, balaghat to tumsar
Translate to English
Translate to Hindi

299417 views
1

Apr 29 (21:38)
SGRFC^~
SGRFC^~   2761 blog posts
Re# 6045597-13            Tags   Past Edits
We want multitracking in these routes
Retweet it click here
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy