Only solution it to remove the pitlines and shift it to binny mill land if this happens then around extra 4-5 pfs can be constructed on sbc otherwise there is no space to lay even a single track and if this not happens then pf 8 to 10 must be linked to bnc side and pf 1 to 7 must be linked to ypr side and pf 1 to 4 must be connected to kgi side
please wait...Translate to EnglishThe only way to fix this is by getting rid of the pitlines and moving them to Binny Mill land. If we do this, we can create about 4-5 additional platforms at SBC. Otherwise, there's no room to lay even a single track. If this doesn't happen, then we need to connect platforms 8 to 10 to BNC side, platforms 1 to 7 to YPR side, and platforms 1 to 4 to KGI side.
please wait...Translate to HindiOnly इसका solution हो सकता है की pitlines को remove किया जाए और इसे binny mill land पर shift किया जाए, अगर ऐसा होता है तो आसपास extra 4-5 pfs स्थापित किये जा सकते हैं, वरना एक भी track रखने के लिए space नहीं है और अगर ऐसा नहीं होता है तो pf 8 से 10 को bnc side से जोड़ा जाना चाहिए और pf 1 से 7 को ypr side से जोड़ा जाना चाहिए और pf 1 से 4 को kgi side से जोड़ा जाना चाहिए।