The route is single un electrified section-also 2429/30 takes a longer route of about 60 kms extra than the 2493/94 but still timing of both have remained same. Sadly 2649 Sampark kranti reaches KCG in 10.5 hrs agains rajdhani taking 11 hrs owing to this route distance