Mysore airport has technical issues with SWR line passing nearby.
Two scenarios possible:
1. If Bangalore's new 2nd airport is getting located in and around Ramanagara on Bangalore Mysore road, Mysore airport will lose it's importance.
2. If Hejjala CMNR line comes through along with extension to Mettupalayam/ Sathy, then doubling is needed.