Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 29 13:10:23 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5991829
Posted: Mar 09 (15:41)

No Responses Yet
Rail News
7513 views
0

Metro
WCR/West Central
Mar 09 (15:41)   Bhopal Metro Expansion: Underground Stations and Elevated Corridor Construction Underway

AdittyaaSharma^~   74121 news posts
Entry# 5991829         Tags   Past Edits
Metro Project in Bhopal: पुराने शहर में 9.83 किमी मेट्रो कारिडोर के लिए 39 एकड़ जमीन का होगा अधिग्रहण

The construction of the priority corridor between AIIMS and Subhash Nagar in Bhopal is 90% complete. The next phase, a 10-kilometer stretch between Subhash Nagar and Karond, is currently underway. LNT Company has been awarded the contract to build an elevated corridor along this route. This section will include a two-kilometer...
more...
underground stretch with two underground stations near Ash Bagh and Barasia Road. The stations will be close to Bhopal Junction and Nadra Bus Stand. The project also includes the construction of four additional stations beyond Subhash Nagar. LNT is also responsible for the supply, installation, and commissioning of the fast-tracking system, ballast-less track, and workshops for both the Purple Line (Subhash Nagar to Karond) and the Red Line (Ratnagiri Crossroads to Bhadbhada Crossroads). This contract is worth Rs. 238 crores. The construction work will be divided into two phases, with Phase 1 covering Subhash Nagar to Bharat Talkies and Phase 2 covering Sindhi Colony to Karond. The goal is to launch the Purple and Red Lines in Bhopal by 2025. To meet this deadline, the Metro Rail Corporation aims to complete the civil work for the Purple Corridor by 2024. The Purple Line will be 14.19 kilometers long, and the Red Line will be 12.88 kilometers long, with a total estimated cost of Rs. 6941.40 crores.

Bhopal me AIIMS se Subhash Nagar tak ka priority corridor ka construction 90% complete ho chuka hai. Ab, Subhash Nagar se Karond tak ka 10 kilometer ka stretch banaya ja raha hai. LNT Company ko is route pe elevated corridor banane ka contract mila hai. Is section me, 2 kilometer ka...
more...
underground stretch bhi hoga, jisme Ash Bagh aur Barasia Road ke paas 2 underground stations banenge. Ye stations Bhopal Junction aur Nadra Bus Stand ke paas honge. Iske alawa, Subhash Nagar se aage 4 aur stations banne ka plan hai. LNT, Purple Line (Subhash Nagar se Karond tak) aur Red Line (Ratnagiri Crossroads se Bhadbhada Crossroads tak) ke liye fast-tracking system, ballast-less track, aur workshops ke supply, installation, aur commissioning ka bhi zimma sambhaal raha hai. Is contract ki value Rs. 238 crores hai. Construction work 2 phases mein hoga, jisme Phase 1 me Subhash Nagar se Bharat Talkies tak aur Phase 2 me Sindhi Colony se Karond tak construction hoga. Target 2025 tak Bhopal me Purple aur Red Line ko launch karna hai. Is deadline ko meet karne ke liye, Metro Rail Corporation ka aim 2024 tak Purple Corridor ka civil work complete karna hai. Purple Line 14.19 kilometers lambi hogi aur Red Line 12.88 kilometers lambi hogi. Is project ki total estimated cost Rs. 6941.40 crores hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5383447 ★★★ 145jishnuthakur12301^...
3247625 ★★★ 134~
2308508 ★★★ 38Yantravinyas
3368675 ★★★ 397mr.train_wala~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy