Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed May 1 03:38:11 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 5750244
Posted: Jun 13 2023 (14:17)

11 Responses
Last Response: Jun 14 2023 (16:38)
Info Update
69246 views
16

★★
Jun 13 2023 (14:17)   AP/Ashokapuram (3 PFs)
mys_air_rail_spotter
mys_air_rail_spotter   150 blog posts
Entry# 5750244            Tags  
3 compliments
Useful Great Useful
Hello everyone, I will be sharing some picturesque information about the ongoing developmental works at Ashokapuram (AP) Railway Station in Mysuru.

The main aim of the development of Ashokapuram (AP) is to facilitate the berthing capacity at Mysuru, reduce the burden of saturation at Mysuru (MYS) by extending few possible trains to the station, and eventually make it convenient for train travellers from central and south Mysuru to utilize the developed facility, instead of traveling 8-10 kms to the main station.
...
more...

The inauguration of the newly developed railway station of Ashokapuram will be on August 15th 2023 (Independence Day). Although, it can be subject to change.

The developmental works at Ashokapuram include :-

1) Yard modelling works for proper alignment of workshop yard as well as the backyard.

2) Construction of new Island Platform PF-4 & 5. The existing PF-1 to PF-3 are rebuilt with extending PF-1 towards Mysuru (MYS) side and Island platforms PF-2 & 3 extended towards Chamarajanagar (CMNR) side.

3)The existing PF-3 and new PF-4 tracks will be connecting both Mysuru (MYS) and Chamarajanagar (CMNR) sides. PF-5 will be connected only to MYS side but a separate dead end on CMNR side.

4) Remodelling of Workshop yard line, by building 2 new sets of shunting tracks next to PF-1 and main line, on the CMNR end.

5) Building another long shunting line next to PF-5 track line, which is dead end towards CMNR side and connected to rest of the platforms on MYS end.

6) Building of new second entry building in the backyard (not connected to the Platform)

7) Extension of the existing Foot over Bridge (FOB) from Island Platform 2&3 to Island platforms 4 & 5 to the second entry building.

Presently, the track remodelling works are over and new platform track lines are ready. The construction works for new 2nd entry building, new platforms 4 & 5, extension works of FOB, building of new Enroute Carriage Watering Systems for PFs 3,4 & 5, and other passenger friendly amenties are still going on. Electrification works are also going on and is disrupted due to remodelling works.

As per the plan, PF-1 & 2 will be utilized for trains running between MYS & CMNR, and PFs 3, 4 & 5 will be used for extended trains from MYS.

I will be sharing my personal renders of the railway station layouts, before and after remodelling. Will also share the pics with some markings.

---------------------------------------------------------------------
IMPORTANT !!

I personally request the admin to update the following information about Ashokapuram (AP) railway station.

Old station - 3 PFs -- PF-1 & 2 connected to both MYS & CMNR sides, PF-3 connected only to MYS side.

New station - 5 PFs -- PF-1, 2, 3 & 4 connected to both MYS & CMNR sides, PF-5 connected only to MYS side.

I request the admin to update the number of platforms of AP to be '5 - five' instead of '3 - three'

---------------------------------------------------------------------

Hope you all liked about the information.
Like !! Comment !! Subscribe !!!
THANK YOU ALL !!!

Translate to English
Translate to Hindi

6 Posts

13726 views
1

Jun 14 2023 (08:18)
mys_air_rail_spotter
mys_air_rail_spotter   150 blog posts
Re# 5750244-7              
Yes sir !! Might overshoot the deadline. I don't know
Translate to English
Translate to Hindi

13478 views
0

Jun 14 2023 (08:27)
mys_air_rail_spotter
mys_air_rail_spotter   150 blog posts
Re# 5750244-8              
Yes sir, there are proposals but still it's really difficult to make build double line between Mysuru (MYS) and Ashokapuram (AP). Particularly in and around Chamarajapuram (CMJ) Halt railway station, there is very little or no space to build a parallel track. There's the backyard of Old Court of Mysuru on one side of the track and a public school and a road on the opposite. Also, there's Kannegowdana Koppal (K.G Koppal) area with many houses nearer to the railway track, which makes it difficult for railways to build double tracks.

Honestly,
...
more...
I also preferred the same idea of a dual line between MYS and AP, but sadly, there are lots of space constraints, particularly at CMJ

Translate to English
Translate to Hindi

13124 views
1

Jun 14 2023 (08:31)
mys_air_rail_spotter
mys_air_rail_spotter   150 blog posts
Re# 5750244-9              
Kind of yes ... Because it's the first railway station 'with loop lines' that you'll get after Mysuru (MYS). Actually, there's a halt station in between MYS and Ashokapuram (AP) called Chamarajapuram (CMJ).

If you come from Bengaluru (SBC) or Hassan (HAS) sides to Mysuru and continue further towards Nanjangud (NTW) and Chamarajanagar (CMNR), you'll get CMJ, then AP.
Translate to English
Translate to Hindi

11886 views
1

Jun 14 2023 (08:50)
KT_Railfan^~
KT_Railfan^~   2015 blog posts
Re# 5750244-10              
Will line after pf5 be used for stabling workshop coaches ? If no they should have put 1 switch on pf5 to Last loop so that trains that have terminated or shunted could have loco reversal via Last loop line. Better option instead of whole rake shunting.
Translate to English
Translate to Hindi

7320 views
1

Jun 14 2023 (16:38)
mys_air_rail_spotter
mys_air_rail_spotter   150 blog posts
Re# 5750244-11              
Yeah right, but also depends on the trains that'll be extended here.
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy