After LHB conversion this train will have only 15 pax coaches this is totally wrong to restrict it to 20 LHB rake. Two more pax coaches should be added and run as full 22 LHB rake and if possible even those parcel vans should be removed. Already SWR is earning a lot of money through freight transportation on this section and now since this train will have more AC coaches even pax revenue from this train will increase.
The CC in my opinion should be
EOG GS*3 SL*3 PC 3E*5 3A*5 2A*2 1A*1...
more... EOG.
please wait...Translate to EnglishYo, bro. This train gonna have only 15 passenger coaches after LHB conversion. That's just not cool, man. Shouldn't limit it to 20 LHB rakes. Need to add two more passenger coaches and make it a full 22 LHB rake. And if possible, get rid of those parcel vans, yo. SWR is already making bank from freight transport on this route and with more AC coaches in this train, passenger revenue gonna go up too. In my opinion, the CC should be EOG GS*3 SL*3 PC 3E*5 3A*5 2A*2 1A*1 EOG.