Crossed Annavaram @ 1110 97km in 64 mins the best run of the day even with slowdown to 5kmph at Elamanchili avg 90kmph use of doing 110-130kmph. Struggle started as HWH Kanyakumari exp is just a station ahead though left 30 mins before @ Vskp with LHB rake reached RJY outer 5 km before @ 1230 and reached @ 1254 on PF2. Goods train with finished iron is placed on PF1. Crossed Kovvur @ 55kmph and touched 129kmph reached Eluru at 1420 mustabada at 1500 slowed to 30 TSR as track work is going on and finally reached Vja at 1540/1600.