Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat May 4 16:22:31 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 5711867
Posted: May 03 2023 (11:34)

2 Responses
Last Response: May 04 2023 (05:10)
Travel Question
47618 views
1

May 03 2023 (11:34)   12623/MGR Chennai Central - Thiruvananthapuram Central Mail (PT) | MAS/MGR Chennai Central (12 PFs)
Krishtrainfan
Krishtrainfan   53 blog posts
Entry# 5711867            Tags  
Why can't they increase the section speed from Perambur to Jolarpettai to 130 km/hr for this train which will reduce travel time.
Translate to English
Translate to Hindi

42264 views
1

May 03 2023 (21:18)
SekarMadras~
SekarMadras~   883 blog posts
Re# 5711867-1               Past Edits
mm probably SR is not interested in implementing compared to other zones of the country. Even kerala VB is said to be running at 68. There was report of leaking inside VB in kerala due to rain. In few years Delhi - Kolkata and Delhi - Mumbai will be running past 200 and south is not even included in the project till now so the trains here will be running slow only always, no respite.
Translate to English
Translate to Hindi

41104 views
1

May 04 2023 (05:10)
deepak.yerr~
deepak.yerr~   6105 blog posts
Re# 5711867-2               Past Edits
1 compliments
Useful
Ballashah Gudur has got 130kmph approved certificate 2yrs back. In Oct 2022 all LHB trains are allowed to do 130kmph and also in many other routes where 130kmph upgradation has taken place. In Jan 2023 Vijayawada Vskp section is upgraded for 130kmph for VB and from Feb/March order trains are also allowed. In JTJ section also all LHB trains are being allowed to do 130kmph. The TT are not yet implemented in any of the section in SCR too and may be implemented ftom OCT 2023 when new TT comes into force and majority of the Loco pilots gets 130kmph training and running certificate. It not about North South divide but it's technical requirements in ground level signaling clearance of cargo trains due to increased speed of express trains to let them to in main lines. All these parameters are being tested in various zones before being imemented in TT...
more...
as cutting running time in one zone will effect timings in other zones and clash with other trains.

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy