It leaves Vskp at 1555 with normal speed it can reach Vja at 2200/10 then Gudur 3 stops 240 Renigunta 400/410 max 1hr late then Kr puram 5.5 hrs 940 then also late by 60 mins max BNC 1000 while VB pases at 1005. Even if SWR gives overtake of VB Shatabdi it can still reach by 1100. This shows the inefficiency if SCR in maintaining schedule. The stoppages are Normal as that of regular trains.