They are slow not coz of Ghats but even on LD GTL line which is FEDL they run horribly slow even Amaravati express slowed down post covid.
SWR gave trains on SBC UBL section major speed ups even before it was fully doubled but on UBL GTL things are pretty bad.
One solution i have is they have not yet restored VSG MAS via YPR to VSG so don't do it instead increase UBL MAS biweekly via GTL RU one day to VSG do RSA with VSG VLNK rake and run it...
more... and then cancel VSG TPTY slip coz we'll already have a full train to RU then increase CC of VSG HYB to 23 coaches and cancel KCG slip.
please wait...Translate to EnglishBro, they be slow AF not just on the Ghats but even on the LD GTL line which is supposed to be FEDL. Even the Amaravati express is crawling after COVID.
SWR be lining up trains on SBC UBL section and speeding them up even before doubling, but on UBL GTL, it's all f**ked up.
Here's a dope solution, cuz they still haven't brought back VSG MAS via YPR to VSG, don't even bother and instead increase UBL MAS biweekly via GTL RU one day all the way to VSG. Do an RSA with VSG VLN rake and run it. Don't need VSG TPTY slip no more cuz we got a full train heading to RU. Also, increase CC of VSG HYB to 23 coaches and cancel KCG slip.