It can be done if there is no political pressure. SCR have trains like Devagiri, Sabari, Falaknuma etc., where SM is more than 12 hrs but there is no sufficient time for PM. Hence, they need to have RSA with other ONT trains. It is better to shift the CDO if they have to remove the RSA and avoid rescheduling, otherwise no other possible scenarios as they can't change the timings due to existing paths.
please wait...Translate to EnglishIt's possible as long as there's no political interference. South Central Railway has trains such as Devagiri, Sabari, and Falaknuma, which have a stoppage time of over 12 hours but not enough time for maintenance work. So, they need to share maintenance facilities with other trains. It would be a good idea to change the Crew Duty Officer's location to avoid disrupting the existing schedules or having to rearrange them. That said, there isn't any other viable solution since train timings can't be changed due to the current tracks available.
please wait...Translate to Hindiअगर कोई राजनीतिक दबाव न हो तो यह किया जा सकता है। SCR में देवगिरि, सबरी, फलकनुमा आदि ट्रेन हैं, जहां SM 12 घंटे से अधिक है लेकिन PM के लिए पर्याप्त समय नहीं है। इसलिए, उन्हें अन्य ONT ट्रेनों के साथ RSA होने की आवश्यकता है। अगर वे RSA को हटाना चाहते हैं और पुनस्तृतिकरण से बचना चाहते हैं तो वे सीडीओ को स्थानांतरित करना बेहतर है, वर्ना मौजूदा पथों के कारण समय समय पर नहीं बदल सकते।