Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun May 5 07:59:35 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 560538
Posted: Oct 23 2012 (22:46)

88 Responses
Last Response: Dec 07 2013 (21:33)
8 Followers
Rail Fanning
64456 views
32

★★★
Oct 23 2012 (22:46)  
 
dhooma shakata vahanam
dhooma shakata vahanam   289 blog posts
Entry# 560538              
A COMPILATION OF RAIL SIGNS AND THEIR MEANINGS:
Compiled by me thanks to years of railfanning experience after reffering to many people and online material, I would quote an example with every sign to aid in understanding to the best extent possible:
The first thing we are concerned about when we are talking about movement of trains is anything which makes the train to de-accelerate, they can be in the following instances.
A
...
more...
PERMANENT SPEED RESTRICTION-A restriction of speed in a particular section (which otherwise is a faster speed permitted one) of a permanent nature, usually placed before steep curves, weak P.Way etc. This is apart from obvious restriction zones like that of loops at a station.
Ex: Permanent speed restriction of 80 KMPH at sirnapalli forest gradient between Uppalvai and sirnapalli stations in SC-NED-MMR line, similar can be found in many sections.
A TEMPORARY SPEED RESTRICTION-A restriction of speed which is imposed temporarily due to varied reasons like P.Way work or other reasons. A typical instance is imposition of speed restrictions before many unmanned LC’s of HYB division of SCR between DHNE-KRNT-KCG-NZB-MUE(Probably to allow better control to LP in case of a confused soul deciding to cross an LC with his road vehicle at the last moment)
Ex: Speed restrictions at Makalidurga ghat between YNK-DMM for up gradation of P.Way.
THE SIGN(for both of the above restrictions): The sign board indicating the speed to be followed would be a Triangular yellow board with speed mentioned in black, usually of reflective material to be visible to LP at night. The train needs to be at the designated speed mentioned on the board by the time it passes the board even though it is typically placed some 100mts before the actual caution abled section. Apart from the board, these cautions would already be mentioned in the Caution order given to the LP before moving the train in a particular section. Again, the crew running a train in a particular section would already e having Road learning without which they are not authorized to pilot a train. So this leaves us with the crew already knowing the restriction, we can travel rest assured as far as risks involved with overspeeding at restricted zones are concerned.
RESCTRICTION TERMINTAION: A restriction in place obviously means it would have to end somewhere, be it permanent or temporary, a large circular yellow board with a black T(again of reflective material) would be placed indicating the termination of restriction. In specific cases of Passenger and goods trains, T/P and T/G boards are placed(T/G usually after T/P as goods rakes tend to be longer) indicating termination of speed restriction of passenger and goods trains.
Railfanning Note: After a restriction is terminated while train is on a curve, one can find the display of flags by Guard and ALP, it’s amazing to see this sight especially in diesel locos accompanied by the chugging/buzzing(For Alcos and EMD’s respectively) and vigorous waving of flags.
I understand many of you must have seen this earlier, if not please try to watch the strict compliance of speed at restrictions and terminations, not to forget the display of flags/Lights.
I hope this has been useful, please keep adding while I add some more too, For a knowledgeful and safe railfanning Experience.
Cheers.

Translate to English
Translate to Hindi

5 Public Posts - Tue Oct 23, 2012

49 Public Posts - Wed Oct 24, 2012

4 Public Posts - Thu Oct 25, 2012

9709 views
6

Oct 25 2012 (15:16)
dhooma shakata vahanam   289 blog posts
Re# 560538-75              
BASIC NOTES ON ELECTRIC LOCOMOTIVES:
Two types of power systems are used in OHE systems of Indian Railways electrified sections for operations, they are 1.5KV DC supply and 25KV AC supply, the latter being more widely used than the former and DC traction all set to be phased out soon, with WR turning totally AC now. The OHE power is useless unless we bring an electric loco to use it, so lets get to it now:
ELECTRIC LOCOMOTIVES: I have mentioned earlier that diesel locos we usually see are nothing but a
...
more...
huge diesel generated mounted on the bogies only to provide electricity to the relatively smaller traction motors fixed to the wheels, in that case work had to be done to rotate the alternator hence the bulky size whereas electricity is already available in Electric Locos with OHE wires above yet they are quite large too.
That is because the OHE catenary supplies only single phase AC of 25Kv, voltage needs to be regulated and Rectified to DC to be supplied to ttraction motors in many Locos, Modern three phase locos however use three phase AC(WAP-7, WAG-9 etc) which is produced after conversion of single phase OHE AC to 3 phase using a thyristor conversion system, the use and accecability of 3 phase locos have increased with the wide spread use of solid state equipment for an efficient manipulation of physical elements of dynamic electron movement.
DC Locos are similar to AC ones with a few changes, pole shoes on the Pantograph needed to be thick and strong due to the strong DC current. I hope many of you are aware of the unidirectional propagative character of DC whereas AC is bi-directional hence DC current gives a powerful jolt when passed through a human body while AC throws you away. DC is fed to the traction motors after required manipulation.
It has to be noted that an electric locomotive or any household electric equipment would not work if there is no possibility for electricity to return. In case of Electric Locomotives return current is through the wheels to the rails therefore getting grounded. This is a continuous process, if continuity ceases to exist between locomotive and ground it wouldn’t run. This is ensured by metallic conductive strips being placed in periodic intervals connecting OHE poles and the Rail, therefore current returns through the metallic OHE pole in this case.
Railfanning Note: Metallic strips can be observed at many OHE poles connecting the bottom of the pole to the rail. These long metallic strips of width say 1.5 inch are used as a medium for return current.
To be continued..

Translate to English
Translate to Hindi

10 Public Posts - Thu Oct 25, 2012

2 Public Posts - Sat Oct 27, 2012

4 Public Posts - Thu Nov 01, 2012

5 Public Posts - Mon Apr 15, 2013

1 Public Posts - Wed Apr 17, 2013

2 Public Posts - Tue Apr 23, 2013

1 Public Posts - Thu Jun 27, 2013

3 Public Posts - Fri Dec 06, 2013

1 Public Posts - Sat Dec 07, 2013

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

1870067 ★★★ 223GondwanaExpress^~
3242050 ★★★ 349~
5257556 ★★★ 133jishnuthakur12301^...

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy