Tenders / Engg / ER
1. Conducting Final Location Survey, Traffic survey, submission of comprehensive DPR for all civil, electrical and S&T work, preparation of detail estimate along with Alignment Plan, Yard Plan , drawing for minor bridges, major bridges, ROB/RUB, FOB , level crossing drawings , Hydrological & Geotechnical Investigation and all other ancillary works, Preparation & submission of EPC Tender document for all works including Electrical, TRD and S&T for :
(A)...
more... Jamalpur-Munger Double Line with Bridge over River Ganga including Jamalpur avoiding
line - 14.0 Km (Approx.)
(B) Barharwa-Bhagalpur 3rd Line - 136.9 Km (Approx.)
(C) Barharwa-Bhagalpur 4th Line - 136.9 Km (Approx.)
2. Supply, spreading and compaction of balance quantity of blanketing material (stone dust) and other miscellaneous work from km 19.00 to 38.11 in connection with construction of new BG line between Mohanpur to Hansdiha.
3. Construction of Proposed retaining wall with pile foundation in between Ch: 1325-Ch 1575 toward A1 (AHN end) and Ch: 2160 to Ch2274 toward A2 (SPLE end)(both approaches of important Br-340) and other ancillary works under the jurisdiction of DY.CE/Con/MLDT in connection with Monigram- Nimtita doubling.
4. Annual Maintenance Contract of 08 nos of Webfil make Universal Fail Safe Block Interface installed in the Block Sections of HSDA - PYHT - 2, PYHT - Godda - 2, KEU-DNRE - 2, RJL - TPH - 2 under Malda division of Eastern Railway with the OEM for the period of three years.