17015/16 Visakha Exp is going to be LHBfied very shortly.
It can be speeded up because the Doubling and Electrification work between NDD, BVRT GDV and
BZA is almost finished.
It has been lying vacantly for more than 17 hours in BBS yard blocking the stabling lines.
If...
more... the LHB rakes are to be utilised properly, Visakha Exp should be extended up to SBP soon after its LHBfication.
To compensate the loss of berths one SF train between PSA and Charlapalli should be started soon after the extension of Visakh Exp to SBP.
Stops of Visakha Exp at PDU,KBM, TIU, can be abolished.