MAQ trf means VSG will loose connectivity as it will reverse direction at MAO. Also recently VSG MLA along with locals have demanded running spcl trains to VLNK so VSG loosing VLNK connection the locals won't support that. Better to run another VSG VLNK weekly via MAJN PM @VSG. Should be possible once 2nd pitline is commissioned only thing needs to be taken care is KRCL. Also via KRCL means full 24 coach train they can run.