After rourekela the link part 3287A/3288A was extended to bilaspur. Then the link was cancelled and the whole rake started coming to bilaspur. After some time the train was extended to durg on one end and short terminated to rjpb from Danapur earlier.
It never terminated at raigarh or raipur