There was no passenger running in the current slot of ers tatanagar in bvrt ndd rjy slo section such that the slot of passenger was cancelled to give path to this new train.
and at the same time ur basis of swapping paths of freight and passenger trains as the sole way out for speeding up of trains / new slots in ndd slo section doesnt hold good as per the examples i have provided above.