This legend train needs massive speed as pride and only dedicated train for mfp and nearby region as too much slack as tt of normal express train average speed must be minimum 65kmph end to end as whole route is electrified till gkp is double electrified line and rest is in progress as everything needs to upgrade with time but in IR instead speed getting downgrade as average speed 70 in gkp gzb section easily possible need to change else better change to mail train as alteast fare of sf will not required