With no change in TT, this is a crawler. 1000 kms SBC LTT in 24 hours!?!.
It takes 10 hours to cover 320 kms (GTL to SBC). Minimum 4 hours can be saved with proper aggressive TT.
Same situation for Udyan also.
What is the use of double line, electrification etc if running time is not reduced?
Atleast...
more... one aggressive super fast should run between Bangalore and Mumbai.
Instead of blaming interzone conflicts, SWR should run a proper SF via Hubli atleast.