Your demand is illogical and infeasible. Whenever it runs, it has RSA with SHM-Chennai. It arrives JP at 6 and leaves for return at 12. So no further extension is possible as rake is already optimally utilized. And there is no demand either on that route for this type of train. If you see composition, it is mostly AC.