Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu May 9 18:58:33 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 4414771
Posted: Aug 31 2019 (14:47)

10 Responses
Last Response: Sep 20 2019 (22:02)
General Travel
21167 views
3

Aug 31 2019 (14:47)   LKO/Lucknow Charbagh NR (9 PFs)
guest   98 blog posts
Entry# 4414771            Tags   Past Edits
#1 Lucknow De-Congestion Plan(Both NR and NER)-
1)Shifting All and Every Trains Going From Cnb-Bbk to be diverted via Aishbagh Trains That can be Shifted-Arunachal,Gkp & Champaran HS,Sabarmati,Kaifaayat,Barauni Mail,Panvel and many other Weekly Trains and all memu trains from cnb.
2)Shifting Trains like Gomti and Lko ac express which can easily have ljn ner as their terminal and some trains to aishbagh that go towards daliganj and orignate and ljn ner.
3)
...
more...
Divert Kgm Garibrath via sitapur,sidhauli and have a loco reversal of gomtinagar express at daliganj or aishbagh.
4)2nd line from aishbagh to manaknagar.
5)Yard Re-Modelling of lko nr and adding some platforms(Proposed In Pink Book) ASAP.
This is a series of suggestions for Many Congested Stations.It is my personal opinion and maybe many people may disagree and say i have no knowledge, so lets have a coversation in the reply section.

Translate to English
Translate to Hindi

5 Posts

8377 views
2

Sep 11 2019 (19:54)
Rohit_2912~
Rohit_2912~   679 blog posts
Re# 4414771-6              
1. 2 more PF at LKO.
2. Quadrupling tracks between LKO and dilkusha and LKO and alambagh west cabin
So that all 4 routes have separate lines and no disturbance from each other.
3. All terminating trains at LKO from CNB and MB side should terminate at LJN.
4.
...
more...
All terminating trains at LKO from GD and Faizabad side should terminate at GTNR and LJN.
5. GTNR should have 5 running lines with 3 PFs for running trains and 3 PFs for terminating trains
6. Daliganj - Malhour doubling and Malhour BBK quadrupling.
7. Malhour to Amausi bypass line for freights and meeting with Utratia to Alamnagar freight bypass line.
8. It is almost impossible to double the Aishbagh Manaknagar line.
9. However a new CNB ganga bridge should be made.
10. Triple line between amausi and manaknagar
This is my 10 point plan for LKO redevelopment.
After, all of this is executed LKO station will be so smooth, trains will reduce their delay while crossing Lucknow

Translate to English
Translate to Hindi

6704 views
0

Sep 20 2019 (16:28)
DevR
DevR   63 blog posts
Re# 4414771-7               Past Edits
I think Malhour BBK line Quadrupling is not in sight of railway... Railway is acting slow in tripling and Quadrupling of existing congested double lines ЁЯШЖ so maybe we should reduce our demand to Malhour Barabanki line to triple it
But It is very urgent to build Quadruple line Between Lko to Dilkusha cabin and Railway should atleast make a plan for it ЁЯЩД They are ignorant about LKO.
Average 45 - 60 min Stoppage in LKO outer every time I traveled from here ЁЯШП
Translate to English
Translate to Hindi

6543 views
0

Sep 20 2019 (16:33)
DevR
DevR   63 blog posts
Re# 4414771-8               Past Edits
this is the situation at Present, after Bypassing few trains, if Aishbagh Badshahnagar bypass had not opened situation would be much more excruciating ЁЯджтАНтЩВя╕П
Translate to English
Translate to Hindi

6531 views
0

Sep 20 2019 (21:59)
Rohit_2912~
Rohit_2912~   679 blog posts
Re# 4414771-9              
Best performance at LKO outer that I have seen is by 12571 that did bbk to LKO in 37 minutes. It was running 80 minutes late from gd and arrived lko only 40 minutes late.
Non stop GD to LKO pf 5
Translate to English
Translate to Hindi

6564 views
0

Sep 20 2019 (22:02)
Rohit_2912~
Rohit_2912~   679 blog posts
Re# 4414771-10              
That's why malhour daliganj doubling is absolutely necessary for smooth flow of trains. I also think that they should have doubled the tracks from ljn to ash
Only a few meters of track and two switches will fulfill this and also solve the issue of track switch at aishbagh that trains like intercity and 15203 do at 10kmph consuming a lot of time.
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy