3 Tarakeswar-Bishnupur with extension upto Dhaniakhali, ArambaghIrphala, Irphala-Ghatal (11.2 km), Arambagh-Champadanga (23.3
km) & Bishnupur-Uparsol (31.8 km) and new material modification
for Mynapur-Kamarpukur via Birsha (19 km) Means TAK-VSU project speed ed up.
5 Azimganj-Murshidabad (Jiaganj), incl. railway bridge over river
Bhagirathi....
more... Means Double Line making amenities granted & project speede ed up.
8 Tarkeshwar-Magra (51.95 km); Only This line may be done.
14 Bardhaman-Katwa (51.52 km) with new material modification for
Katwa-Bazarsau (30.59 km) - doubling, Katwa (Dainhat)-Mateswar
(34.4 km), Negun - Mangalkot (8.60 km) & Mateswar - Memari
(35.6 km) - NL. With BWN-KWAE & KWAE-AMP lines already made BG, doubling of KWAE-Bazarsau , KWAE-BWN may be speed ed up.
16 Habra-Bongaon Phase-I (Habra-Chandpara) & Machlandapur Swarupnagar. Doubling may be speed ed up.
18 Kalinarayanpur-Krishnanagar with Krishnanagar-ShantipurNabadwipghat - GC, Krishnanagar-Chartala, MM for KrishnanagarChapra-NL, Naihati-Ranaghat-3rd line, NabadwipghatNabadwipdham upto BB loop (9.58 km), Ranaghat-Lalgolastrengthening (bridge No.2). Importance given.
22 Tinpahar-Sahibganj (37.81 km) - As phase-I of doubling of
Tinpahar-Bhagalpur. Project speed up.
34 Dankuni-Chandanpur- 4th line(25.41 km) as 1st phase of DankuniSaktigarh 4th line. Only this project
57 Dum Dum Jn. - Flyover to improve passage of goods &
mail/express trains. Good move.
58 Tikiapara-Howrah - Removal of operational constraints by laying
addl track below Chandmari bridge. Can end Train waiting at HWH outer.