Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Oct 7 14:15:02 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 4215544
Posted: Feb 02 2019 (11:21)

4 Responses
Last Response: Feb 02 2019 (12:14)
General Travel
1694 views
0

Feb 02 2019 (11:21)  
RailFanSagnick~
RailFanSagnick~   252 blog posts
Entry# 4215544              
Pink book (Eastern Railways) 2019-20
Translate to English
Translate to Hindi

616 views
0

Feb 02 2019 (11:39)
Balgobind Mishra~   1866 blog posts
Re# 4215544-1              
Please share Link....not able to open
Translate to English
Translate to Hindi

603 views
0

Feb 02 2019 (11:45)
12658ChennaiMail^~
12658ChennaiMail^~   13417 blog posts
Re# 4215544-2              
Just checked it is opening, check again
Translate to English
Translate to Hindi

856 views
0

Feb 02 2019 (11:51)
FraudsterConman
FraudsterConman   7670 blog posts
Re# 4215544-3               Past Edits
3 Tarakeswar-Bishnupur with extension upto Dhaniakhali, ArambaghIrphala, Irphala-Ghatal (11.2 km), Arambagh-Champadanga (23.3
km) & Bishnupur-Uparsol (31.8 km) and new material modification
for Mynapur-Kamarpukur via Birsha (19 km) Means TAK-VSU project speed ed up.
5 Azimganj-Murshidabad (Jiaganj), incl. railway bridge over river
Bhagirathi.
...
more...
Means Double Line making amenities granted & project speede ed up.
8 Tarkeshwar-Magra (51.95 km); Only This line may be done.
14 Bardhaman-Katwa (51.52 km) with new material modification for
Katwa-Bazarsau (30.59 km) - doubling, Katwa (Dainhat)-Mateswar
(34.4 km), Negun - Mangalkot (8.60 km) & Mateswar - Memari
(35.6 km) - NL. With BWN-KWAE & KWAE-AMP lines already made BG, doubling of KWAE-Bazarsau , KWAE-BWN may be speed ed up.
16 Habra-Bongaon Phase-I (Habra-Chandpara) & Machlandapur Swarupnagar. Doubling may be speed ed up.
18 Kalinarayanpur-Krishnanagar with Krishnanagar-ShantipurNabadwipghat - GC, Krishnanagar-Chartala, MM for KrishnanagarChapra-NL, Naihati-Ranaghat-3rd line, NabadwipghatNabadwipdham upto BB loop (9.58 km), Ranaghat-Lalgolastrengthening (bridge No.2). Importance given.
22 Tinpahar-Sahibganj (37.81 km) - As phase-I of doubling of
Tinpahar-Bhagalpur. Project speed up.
34 Dankuni-Chandanpur- 4th line(25.41 km) as 1st phase of DankuniSaktigarh 4th line. Only this project
57 Dum Dum Jn. - Flyover to improve passage of goods &
mail/express trains. Good move.
58 Tikiapara-Howrah - Removal of operational constraints by laying
addl track below Chandmari bridge. Can end Train waiting at HWH outer.

Translate to English
Translate to Hindi

607 views
1

Feb 02 2019 (12:14)
guest   628 blog posts
Re# 4215544-4              
Eastern railway got good share in this budget with many new lines, doubling works
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy