At Gadag juction they demanded just extend the width of ROB as Lot of Pass at Evening after 6pm lot of trains come at a time and freights looped between PF-1 and PF-2 so ROB will be packed for a while but their railways didnt cared ha ha i am not Gadag oriented here but its necessary to extend the width of ROB atleast instead of New ROB to burden on Railways for funds so that maximum pass can pass easily at that peak hours