Great news. Along with this, SWR is required to link PF 1-7 to YPR side and 8-10 to BNC side. This will give enough flexibility for trains passing through SBC (example LTT CBE). More trains like Chalukya, UBL/ Vasco Chennai express can pass through SBC.