On Tuesday SC Vskp came with Royapuram WAP 7 in which I travelled. Left Vja at 210 Tadepalligudem(my boarding Point) 358 Vskp 2135.two brutal overtakes at Hamsavaram(Tuni) 25 mins stoppages for YPR Hatia and Konark Exp both non SF. There is no use powerful engines. It's signalling freight traffic on the route and time zone which deCides the run on that day in particular section. Stopped at NDD for 30 mins for clearance all three trains in line at different stations. All three ran with 8-10 min gap between Nuzvid and Hamsavaram for 205km for 3hr 45mins.