News Entry# 0
Due to traffic block for engineering works in Chennai division, Train No 13351 Dhanbad-Alappuzha express arriving at Alappuzha on dates 01.10.2018, 08.10.2018, 15.10.2018 and 22.10.2018 (4 days) will be regulated for 3 hours in Gudur – Chennai
section.; .▶️ At Rourkela , 18189 is attached at the back.▶️CC from ROU is LOCO-GS-SLR-S1... S8-PC-A1-B1-B2-B3-A2-ST1..ST5-GS-SLR.▶️1st SLR and GS gets detached at Rourkela ▶️Stoppage at Gollaprolu is withdrawn w.e.f. 02 october 2018.
News Entry# 0
Due to traffic block for engineering works in Chennai division, Train No 13351 Dhanbad-Alappuzha express arriving at Alappuzha on dates 01.10.2018, 08.10.2018, 15.10.2018 and 22.10.2018 (4 days) will be regulated for 3 hours in Gudur – Chennai section.
.▶️ At Rourklea , 18189 is attached at the back.▶️CC from ROU is LOCO-GS-SLR-S1... S8-PC-A1-B1-B2-B3-A2-ST1..ST5-GS-SLR.▶️1st SLR and GS gets detached at Rourklea ▶️Stoppage at Gollaprolu is withdrawn w.e.f. 02 october 2018.