* Going by current progress, the proposed semihigh speed train is far from reality. More over not enough traffic is there on the BSP-NGP route to feed paxs to Gatimaan type 160kmph train.
* SECR should make minor upgradation of its track operate all the LHB trains at 130kmph speed, which shall be good enough.