* This train will be diverted via DHN-GMO-CRP w.e.f 15th June, 2017 but the time table has not been changed and is same.
* This Shatabdi needs to cover the 47 kms in 1 hour 2 minutes as it does now for 34 kms DHN-CRP via Katrasgarh.
* Will it be able to maintain its punctuality considering that it will have QLR at GMO which would consume minimum 20 minutes.
*...
more... Members can throw light on this matter about the punctuality because diversion should have been done with few changes in time table.
* The timings at GMO as per Hindustan newspaper is 12019 ARR-09.52 DEP-10.12, 12020 ARR-16.57 DEP-17.17.