I Think it can be easily done becoz DHN GMO section is a high speed section and DHN will give the highest priority to this train. It can cover the section somewhat like this-
DHN-GMO= 25mins
GMO-CRP= 18mins
So taking a total of 43 mins in covering the section, now 62-43= 19 mins, this time can be used for the LR at GMO