Not feasible.. You cannot end at ALLP. Can't do maintenance.. Plus 13352 is already there.. And the ods of SR or TvC running a train through ALLP is lower than one to punalur. Either extend to QLN or end at ERS.I think ERS would be fine..RsA with 16303/04/05/06/07/08/13/14