As per the news in Hindu - If every things go as planned, electric trains will run on the Kozhikode-Shoranur stretch by the end of March 2015. In the first phase, only MEMU trains will be operated between Kozhikode and Shoranur, while passenger express and super-fast trains will be electrified only after the completion of electrification of the Shoranur-Mangalapuram stretch. (Don't know which MEMU???)
I doubt the statement "CLT don't have the facility to for the loco change". Why three line is required for loco change?