Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Jul 14 20:32:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 1225472
Posted: Sep 26 2014 (21:55)

13 Responses
Last Response: Oct 06 2014 (19:06)
Rail News
5425 views
0

Sep 26 2014 (21:38)   ROYAPURAM THIRD TERMINAL PROPOSAL
 

MSRINIVASANME~   1141 news posts
Entry# 1225472   News Entry# 195769         Tags   Past Edits

8 Posts

2396 views
0

Sep 29 2014 (07:29)
MSRINIVASANME~   4761 blog posts
Re# 1225472-9              
Gudur bound passenger walk to the extreme Eastern Side of the CHENNAI Central Terminal and Arakkonam bound passenger as ever walk to the Western Side of the Central station.Or both side bound passenger can travel upto the BASIN BRIDGE JUNCTION and switch over to their destination at the BASIN BRIDGE JUNCTION easily.
Translate to English
Translate to Hindi

2597 views
0

Sep 30 2014 (03:21)
selvasssm^~
selvasssm^~   5619 blog posts
Re# 1225472-10              
Then if Gudur side EMU is run with only 2 PF then service augumentation cannot be done and EMU will pile up at outer wanting for PF and will increase congestion.
Translate to English
Translate to Hindi

2771 views
0

Oct 06 2014 (18:43)
12YEARSINIRI^~   11515 blog posts
Re# 1225472-11              
Sir SR is doing good work in MAS, the problem with MAS is , if a train has to be taken out of MAS then it will obstruct the main line as MAS does not have dedicated line which goes to yard, the empty rake will obstruct the main line , so the trains from BZA and AJJ side will be stranded. It will take nearly 15 mins to take the rake back to yard . Moreover BBQ yard is overflowing with coaches. IR did not sanction enough funds to SR to improve BBQ. It handles more no of coaches than any other yards. Entire MAS has just 2 yards. Due to lack of space the rakes are parked even 10 to 15 kms away from the city. Just 300 persons are employed in BBQ yard instead of 700. The main problem in MAS is , its a terminal station ,...
more...
the yard is somewhat far , the lines leading to yard mingles with main line , not enough parking space. thats why trains are kept in Platform

Translate to English
Translate to Hindi

2712 views
1

Oct 06 2014 (18:55)
Onemail~
Onemail~   6523 blog posts
Re# 1225472-12              
another issue with MAS is long distance train coming at MAS, having loco change, halting for more that 30min. If it can bypass MAS and instead provide stop at Permabur, it would be very good. Will reduce conjection little bit
Translate to English
Translate to Hindi

2840 views
2

Oct 06 2014 (19:06)
12YEARSINIRI^~   11515 blog posts
Re# 1225472-13              
yeah . Vyasarpadi - Korukkupet can be used. SR wants that line only for freights. Bangalore-Dibrugarh is the only passenger train plying in that line. Raptisagar, ALLP-DHN/TATA, Guwahati expresses, Sanghamitra can be diverted. All GHY bound trains occupy MAS at 6 o clock which is a prime time. This route can de congest for sure.
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6116086  13ER_PRAGADESH_SK_NG...
5650504 ★★★ 104jishnuthakur12301^...
4465985 ★★★ 132AvishekRay~
4251346 ★★★ 132AvishekRay~
6009800 ★★ 28jishnuthakur12301^...
5955786 ★★★ 45fanof12801~
6007860 ★★★ 88RailwayFiles~
3242050 ★★★ 353~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy