i think this was an all AC train when it was launched and then on experimental basis 5 sleeper coaches were attached. and as usual stoppages were increased. really cant blame the railways. will already cramped schedules its not always possible to have new trains, they are forced to provide stoppages from time to time. im sure durontos will face the same fate