Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed Jun 19 23:18:33 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Page#    63312 Blog Entries  next>>
Info Update
2755 views
1

Today (22:07)   13433/SMVT Bengaluru - Malda Town Amrit Bharat Express | RCF/Kapurthala Rail Coach Factory (1 PFs)
Harsha_12627^~
Harsha_12627^~   5175 blog posts
Entry# 6100284            Tags  
Amrit Bharat Express with Revised Coach Composition:

1SLR
6 GS
4 SL
1
...
more...
PC (Non AC Pantry Car)
4 SL
5 GS
1 SLR

More 50 Amrit Bharat Express to be turned out

Translate to English
Translate to Hindi

2282 views
0

Today (22:09)
GujaratRailways^
GujaratRailways^   1925 blog posts
Re# 6100284-1              
Pantry Car add karenge
Translate to English
Translate to Hindi

2271 views
0

Today (22:13)
HarshaI22159^~
HarshaI22159^~   10488 blog posts
Re# 6100284-2              
General Increased and Sleeper Reduced ЁЯШв
Translate to English
Translate to Hindi

2067 views
1

Today (22:17)
CrazyTraveller~
CrazyTraveller~   3587 blog posts
Re# 6100284-3              
1 compliments
Agree
Ye to ulta kr rha 12 sl or 8 gs hona chahiye tha
Translate to English
Translate to Hindi

1317 views
0

Today (22:35)
SCRrailfan
SCRrailfan   167 blog posts
Re# 6100284-4              
General increase is a good decision,it can reduce load on sf/mail express train on that route.
But catch is AB should be atleast Tri weekly to reduce burden on normal trains
Translate to English
Translate to Hindi

1 Posts

568 views
0

Today (23:00)
ImRaaN^
ImRaaN^   5152 blog posts
Re# 6100284-6              
Any idea of these 50 to run on which routes?
Is Mumbai Nagpur on the cards?
Translate to English
Translate to Hindi
2 Followers
Info Update
82228 views
5

Jun 12 (20:09)   12821/Dhauli Express (PT) | ADL/Andul (5 PFs)
Anubad_008^~
Anubad_008^~   5312 blog posts
Entry# 6093286            Tags   Past Edits
2 compliments
Great Useful
Due to 7 days Pre-NI from 22.06.24 to 28.06.24 & 3 days NI from 29.06.24 to 01.07.24 works at Andul. Following trains will cancel . Plan your journey accordingly!
Translate to English
Translate to Hindi

7799 views
0

Jun 14 (22:56)
VPEEYYT~
VPEEYYT~   1831 blog posts
Re# 6093286-1              
ER and SER are both worthless in terms of NI work scheduling. They should have chosen 21/06/24 - 24/06/24(up to 0500hrs).
Translate to English
Translate to Hindi

831 views
0

Today (22:51)
Rail12345
Rail12345   2340 blog posts
Re# 6093286-2               Past Edits
This news on cancellation of trains due to NI at Andul is FAKE. No such PR from SER
Translate to English
Translate to Hindi
Info Update
2555 views
1

Today (21:46)   13434/Malda Town - SMVT Bengaluru Amrit Bharat Express
PurushottamExpress^~   25542 blog posts
Entry# 6100259            Tags  
1 compliments
Great
NOW AB Will Have PC
Translate to English
Translate to Hindi

1644 views
1

Today (22:05)
SCRrailfan
SCRrailfan   167 blog posts
Re# 6100259-1              
So Totally 55 AB are Going To Be Manufactured In This Financial Year
Translate to English
Translate to Hindi

1462 views
1

Today (22:10)
GujaratRailways^
GujaratRailways^   1925 blog posts
Re# 6100259-2              
Yes Because LHB Coaches hi to he Engine me thodi Mahenat lagti
Translate to English
Translate to Hindi
Info Update
95288 views
12

★★
May 28 (00:10)   MLDT/Malda Town (7 PFs)
WAP7NFRMLDT~
WAP7NFRMLDT~   942 blog posts
Entry# 6077610            Tags   Past Edits
6 compliments
Useful Useful:IR should take decision immediately Useful Agree Agree Agree
According to this Diagram , Pitline 2 of Malda Town Coaching Depot is almost empty now with many vacant slots as Farakka express is sent to Balurghat CDO.

Only rake of 03409/10 Jaipur spl /03417/18 Surat spl is maintained now in this pit that too in a single 7-12 hours slot as both trains are heavily late. So only 1 PM slot is used now after extension of Farakka Express.
...
more...

In my opinion ER should allocate 1 Dedicated LHB rake for a new train From MLDT to any place in Rajsthan & frequency of 13429 must be increased to triweekly to utilize its lieover of 5 days. 13425's Rake also must have RSA with a regular train

Pitline 3 is also empty so zones like CR, NWR, WR, SR can propose new trains to MLDT who can have their SM here. Most slots are vacant in Pitline no-3

Please share your opinion everyone.

Pic credits- User 2260785
screen name: Vijayawada

Translate to English
Translate to Hindi

10 Posts

11250 views
0

May 28 (10:05)
WAP7NFRMLDT~
WAP7NFRMLDT~   942 blog posts
Re# 6077610-11              
Oito Jishnu sir bollo slip er jonno division switch hoyegechilo back in the days
Translate to English
Translate to Hindi

10704 views
0

May 28 (10:18)
ANGAD_69001~   892 blog posts
Re# 6077610-12              
Hmmm
Translate to English
Translate to Hindi

2 Posts

2006 views
0

Today (21:25)
TheFlyingScotsman
TheFlyingScotsman   41 blog posts
Re# 6077610-15               Past Edits
If any Rail Enthusiast from Maldah (or elsewhere too) may be kind enough to respond... Maldah is among one of Bengal's Top 5 cities (apart from the state capital), and tens of thousands of people travel to and from Maldah and its adjoining stations by train every day. Malda is also the nodal median point connecting North and South Bengal. Very important city/region for trade and tourism. It's really sad that the city's Railway Infrastructure & Services have not seen much upgrade since the time of Gani Khan Chowdhry.

Do you feel
...
more...
it's time Maldah's significance on the country's Railway Map was pumped up? And why all the load/pressure on MLDT? Why are stations within the city's vicnity like Old Malda and Malda Court not beig upgraded into mini-terminal stations with SM capacities? That's why my query, particular to those from Maldah region:

1. Is it possible to carve out separate Railway Zones for Maldah and Bhagalpur, so that Malda can have more independence and flexibility, and Bhagalpur can look after itself and those other neighbouring BR/JH towns?

2. Is it possible to build more platforms (and perhaps rebuild the stations) at Old Malda and Malda Court? Maybe Old Malda can be upgraded to at least 5 platforms - with ample sidelines for Freight/Goods trains, and upto 3 platforms for Malda Court? Lot of empty space adjacent to both of these stations, right? And after these expansions (maybe under Amrit Bharat scheme), trains not based out of MLDT base can be terminated at either of these two stations - to free up MLDT.

3. Is it possible to build a branch line near Banshata P area connecting MLDT and Malda Court, so that there can be train connectivity between both sides of Malda city across Mahananda River? Also, MLDT - Eklakhi Jn.... Third line possible?

4. With these above infrastructure in place, why not make MLDT into a full fledged terminal (with its own CDO base), with new fresh set of SF trains to NDLS, Mumbai, MAS/SMVT, SC/HYB, Udhna/Gujarat, Kerala (most critical need of the hour) and perhaps some other points of North India like a JP or a ASR or a HW/YNRK or a or a JAT/SVDK? You know, like more Pan-India connectivity, so as to ultimately reduce pressure on other Terminals in Kolkata or Bhagalpur or even Katihar/NJP? Plus some additional MEMUs to nearby towns including upto say Berhampore or Krishnanagar or NJP or BLGT or maybe an Intercity/MEMU Express to DGR/ASN... So that you can create a Hub & Spoke Model with MLDT at the centre!

How long will districts like Maldah, the 2 Dinajpurs, Birbhum and Murshidabad continue to burden trains to/from the North East and HWH? It's not possible to build mega terminals at all these points/districts, but MLDT at the epicentre and a Hub & Spoke Model would be sufficient to reduce pressure extensively to all trains passing through the entire Eastern India! Couldn't this prove to be a Win-Win situation for both Railways (ER) and the commuters/passengers of this region?

Thank you for your invaluable time.

Translate to English
Translate to Hindi

1426 views
0

Today (21:45)
WAP7NFRMLDT~
WAP7NFRMLDT~   942 blog posts
Re# 6077610-16               Past Edits
1. It is not possible to carve out railway zones at present but back in the days Bhagalpur was in Howrah Division & Malda Town was in Katihar division. So to introduce new trains Gani khan Chaudhury thought that a entire new division is necessary. So during his term as Railway Minister he introduced Malda Division to fulfil demands of Malda, Sahibganj, Munger, Bhagalpur.

2. Old Malda Jn is not used by people very much since both stations lie in the same route . Malda court's line is a near Bangladesh border,
...
more...
so Malda Town is the main station with being closer to the main city itself.

3. Not possible as a new bridge should be constructed at Mahananda River & it will pass parallel to NH 12 . So for 3rd, 4th line it will be constructed near Malda Bypass of NH12 to reduce goods traffic in current main line. MLDT-EKI 3rd line is possible

4 Gani khan Chowdhury never wanted that a full fledged terminal will be made like Howrah otherwise trains would have to go via Katihar , Barauni for all places which will take more time . So he put Idea of new route from kolkata to siliguri , Ne via Malda by constructing a bridge on Ganga River. with construction of Farakka Barrage entire north Bengal was connected with Kolkata or South India & solved a major connectivity problem

If terminal station is made at Malda then nearby area will be South Dinajpur only & only upper part of Murshidabad be benefitted as top cities like Baharampur, Balurghat, Raiganj etc all these are 100+km away from Malda . So people of these places will prefer to go Kolkata since Kolkata connectivity is good in all cities & Villages of West Bengal.

Translate to English
Translate to Hindi

1321 views
0

Today (21:50)
WAP7NFRMLDT~
WAP7NFRMLDT~   942 blog posts
Re# 6077610-17              
Btw I thank you for expressing your views on current situation of Malda . It is embarassing to know that after BJP govt in 2014 Malda did not get that much upgradation since then as it was a hub of Congress Party & today also. Lets see what happens in upcoming 5 years
Translate to English
Translate to Hindi
Info Update
6258 views
8

Today (17:27)   12801/Purushottam Express (PT) | BTI/Bathinda Junction (7 PFs)
PurushottamExpress^~   25542 blog posts
Entry# 6099955            Tags  
3 compliments
Useful Great Great
Purushottam express Bathinda extension dropped
Translate to English
Translate to Hindi

2778 views
2

Today (20:55)
jishnuthakur12301^~
jishnuthakur12301^~   9075 blog posts
Re# 6099955-1              
Pura gang bana diya tha Purushottam ka band bajane ke liye. Lekin woh gang ka attempt fail ho gaya.
Translate to English
Translate to Hindi
Page#    63312 Blog Entries  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy