ट्रैक में खराबी से पलटी थीं बोगियां, सामने आई गोण्डा ट्रेन हादसे की शुरुआती रिपोर्टAn initial investigation report regarding the train accident in Gonda, Uttar Pradesh has been released. The Commissioner of Railway Safety (CRS) report indicates that the accident was caused by a track malfunction. The report, released on September 5th, includes several key recommendations. The report suggests that three to four individuals could...
more... be held responsible, including the operations department. The station master at the accident site is also blamed for failing to take necessary precautions. Detailed information will be provided in the final report.
On July 18th, the Chandigarh-Dibrugarh Express derailed near Jhilahi in Gonda, with six coaches overturning. The accident resulted in four deaths and 25 injuries. Following the accident, rescue operations were initiated, and a CRS investigation was ordered. The investigation involved questioning officials and staff related to railway safety, security, signaling, engineering, mechanical, and traffic.
Train number 15904, departing from Chandigarh on the night of July 17th at 11:59 PM, was traveling at a speed of 90 kilometers per hour. It reached Gonda railway station at 2:25 PM on July 18th and left at 2:28 PM. The train derailed and overturned at 2:41 PM, between Motiganj and Jhilahi Bazaar, around 18 kilometers from Gonda headquarters. Of the train's 24 coaches, 14 derailed, including six AC coaches and two coaches following the engine.
Gonda, Uttar Pradesh mein train accident ki shuruati jaanch report aa gayi hai. Commissioner of Railway Safety (CRS) ki report ke anusar track mein gadbadi ke karan hadsa hua tha. 5 September ko jaari report mein CRS dwara kuchh ahem sifarishen bhi ki gayi hain. Bataaya ja raha hai ki teen...
more... se chaar log isme zimmedar thahraaye ja sakte hain. Shuruati report mein parichalan vibhag ko bhi zimmedar mana gaya hai. Report mein bataya gaya hai ki ghatna sthala ke station master ne caution lene mein tatparta nahin dikhayi. Vishtrit jaankari final report mein aayegi.
18 July ko Gonda ke Jhilahi ke paas Chandigarh-Dibrugarh Express durghnatnagrast ho gayi thi, jiski chhe bogियां palat gayi thi. Hadse mein chaar yaatriyon ki maut ho gayi thi, jabki 25 ghayal ho gaye the. Hadse ke turant baad bachhav kaam shuru karne ke sath hi CRS jaanch ke aadesh bhi jaari kar diye gaye the. Jaanch mein railway suraksha, suraksha, signal, engineering, yaantrik aur traffic se jude adhikariyon aur karmachariyon se poochhtaach ki gayi thi.
90 kilometer pratighante thi raftaar Train number 15904 Chandigarh se 17 July ki raat 11.59 baje ravana hui thi. 18 July ko train Gonda railway station par dopahar 2.25 baje pahunchi aur 2.28 baje yahaan se nikli. Jaankari ke anusar, hadse ke samay train ki raftaar 90 km pratighante se adhik thi.
Track se utar gaye the 6 coach Train Gonda railway station par dopahar 2.25 baje pahunchi aur 2.28 baje yahaan se nikli. Gonda muख्यालय se karib 18 kilometer door Motiganj-Jhilahi bazaar ke beech 2.41 baje train bepatri ho kar palat gayi. 24 coach wali train ke ek-ek kar 14 coach patri se utar gaye, jinmen se engine ke baad lage do coach samay AC ki chhe bogियां palat gayi thi.