Indore Khandwa Rail Line: ट्रैक पर आने लगा महू-सनावद ब्राडगेज लाइन प्राेजेक्टThe Indore-Khandwa broad gauge rail line project, a long-awaited project, is progressing steadily. The Ratlam division has recently tendered for the construction of a 7.5 km stretch from Patalpani to the Portal-1 of the Beka Tunnel. This stretch includes 30 bridges and is expected to be completed within 15 months. ...
more... The new alignment of the track will diverge from Patalpani and pass through Bedia, Beka, Kulthana, Rajpura, and Choral, with new stations being constructed at each location. A new station is also being built in Choral. The existing line will be connected to the old meter gauge line about 6 km before Mukhtyarabardwala. The project includes 21 tunnels, 36 major bridges, 76 minor bridges, 12 underpasses, and overpasses. The project is divided into two parts, Mahu-Balwada and Balwada-Barwaha. Construction work is also underway on a new broad gauge bridge over the Narmada River at Mortakka, replacing the old bridge. The construction of an ROB will also be carried out at the Patalpani waterfall. The Patalpani to Portal-1 section, which includes hilly terrain, will require several bridges. A 200-meter long bridge will be constructed over the Mehndi Kund tourist spot, resting on pillars. The project is being undertaken in phases to ensure timely completion. The tender for the 7.5 km section between Patalpani and the tunnel has been awarded.
Indore-Khandwa broad gauge rail line project, ek bahut purana project, aage badh raha hai. Ratlam division ne recently Patalpani se Beka Tunnel ke Portal-1 tak 7.5 km ke stretch ka construction ka tender nikala hai. Is stretch me 30 bridges hai aur ye 15 mahine mein complete hone ki ummeed hai....
more... Track ka new alignment Patalpani se diverge hoga aur Bedia, Beka, Kulthana, Rajpura aur Choral se hota hua jaayega, aur har jagah pe new stations ban rahe hain. Choral me bhi ek new station bana raha hai. Existing line ko Mukhtyarabardwala se 6 km pehle purani meter gauge line se connect kiya jaayega. Is project me 21 tunnels, 36 major bridges, 76 minor bridges, 12 underpasses aur overpasses banaye jaayenge. Project ko do parts me divide kiya gaya hai, Mahu-Balwada aur Balwada-Barwaha. Mortakka pe Narmada River par new broad gauge bridge ka construction kaam bhi start ho gaya hai, jisme purana bridge todke new pillars laga diye jaayenge. Patalpani waterfall pe ROB bhi banaya jaayega. Patalpani se Portal-1 tak, jisme hilly terrain hai, bahut saare bridges banaye jaayenge. Mehndi Kund tourist spot par 200-meter lamba bridge banaya jaayega, jo pillars par khade hoga. Project ko phase-wise karke complete kiya ja raha hai, taaki time pe complete ho sake. Patalpani aur tunnel ke beech 7.5 km section ka tender award kiya gaya hai.