Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue May 7 07:13:27 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

TPNR/Transport Nagar (Lucknow) (1 PFs)
ट्रांसपोर्ट नगर
ٹرانسپورٹ نگر


Track: Double Electric-Line

Show ALL Trains
8/277, Rajni Khand, Sharda Nagar, Lucknow
State: Uttar Pradesh

Elevation: 127 m above sea level
Type: Regular   Category: n/a
Zone: NR/Northern   Division: Lucknow Charbagh NR


No Recent News for TPNR/Transport Nagar (Lucknow)
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 4.8/5 (6 votes)
cleanliness - good (1)
porters/escalators - n/a (0)
food - n/a (0)
transportation - excellent (1)
lodging - excellent (1)
railfanning - excellent (1)
sightseeing - excellent (1)
safety - excellent (1)
Show ALL Trains

Station Forum

Page#    Showing 6 to 10 of 24 blog entries  <<prev  next>>
General Travel
231609 views
2

Jan 20 2022 (07:59)   UTR/Utraitia Junction (Lucknow) (3 PFs)
guest
Entry# 5194443            Tags   Past Edits
उत्तर रेलवे ने कहा कि उत्तराटिया-परिवहन नगर-आलमबाग बाईपास लाइन और लखनऊ-आलमनगर खंड पर आलमनगर-परिवहन नगर (9.09 किमी) के दोहरीकरण के संबंध में प्री नॉन इंटरलॉकिंग और नॉन इंटरलॉकिंग कार्य के कारण कुछ ट्रेनें रद्द कर दी जाएंगी।
#doubling
Translate to English
Translate to Hindi

More Posts
Info Update
158452 views
6

Nov 10 2021 (17:29)   13005/Howrah - Amritsar Mail (PT) | TPNR/Transport Nagar (Lucknow) (1 PFs)
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~   10340 blog posts
Entry# 5118575            Tags   Past Edits
Recent YouTube videos show that 13005/13006 running as 03005/03006 is now operating on a WAP-7 electric loco for end-to-end basis. It's MPS may have increased on the Howrah-Bardhaman Chord section but for the rest of its journey the MPS is 110 Kmph. Track renewal works are going on between Madhupur and DDU via Patna so we can expect 130 for this train on Main Line route of Bihar in a few years.
.
Track doubling works between Utretia Jn and Rae Bareli are complete just like between Varanasi and Janghai Jn. Doubling works
...
more...
between Janghai and Gangaganj (near RBL) have probably resumed as works were halted due to lockdowns. Rail fans on YouTube from RBL have told me that this train will have to run at 110 Kmph MPS on BSB-RBL-LKO route even after doubling is complete until the existing single track is renewed like the recently laid 2nd track.
.
Doubling between Varanasi & Utretia will enable NR to introduce some MEMUs and DMUs for local commute. Trains under the Humsafar and Vande Bharat categories are also expected from people of cities on this route but nothing is officially confirmed yet (I expect a Shatabdi and Rajdhani train too).
.
In the years to come, the Amritsar Mail is supposed to be re-routed from Utretia Jn to Alamnagar via Lucknow's Transport Nagar station (TPNR) as the new LKO bypass line is meant to de-congest Charbagh station. All trains coming from Ayodhya Ji/Rae Bareli/Sultanpur side & going towards Bareilly Jn will be re-routed from Charbagh to Transport Nagar station. Alamnagar is also getting a new terminal for shifting extra trains of Lucknow area.
.
I've also come across a video showing speed trials of an LHB special train between Ambala Cantt & Saharanpur via Yamuna Nagar Jagadhri. It seems that track renewal has taken place with mega blocks on that section too and a new direct rail line is planned between Jagadhri & Chandigarh to bypass Ambala Cantt for faster commute. Eastern Dedicated Freight Corridor works are on full swing between Ambala Cantt & Saharanpur and even beyond towards Khurja Jn side where the other stretch till Kanpur has started.
.
I am anxious for EDFC works to start between Dehri-On-Sone and Dankuni for the remaining stretch. The Khurja to Saharanpur stretch of the EDFC is supposed to be a single track stretch due to land space issues. Rest of the EDFC route from Dhandari Kalan (near LDH) to Saharanpur & from Kanpur to Dankuni via Gaya - Dhanbad are expected to be double track sections. I guess the Dehri-Sasaram-DDU section is almost complete if anyone can confirm.
.
All trains from Kolkata (HWH/SDAH/KOAA) to ASR/JAT may be speeded up after the entire EDFC is complete & ready for freight train operations. The Howrah-Dhanbad-Delhi route will also be decongested where making the route free of LCs is also under progress for Mission Raftaar that aspires to run selected trains at 160 Kmph (Vande Bharat Rakes?).
.
Thanks for reading my lengthy post :)

Translate to English
Translate to Hindi

More Posts
Rail Fanning
51405 views
5

Oct 23 2021 (00:56)   TPNR/Transport Nagar (Lucknow) (1 PFs)
c21h30o2~
c21h30o2~   168 blog posts
Entry# 5101352            Tags  
Transport Nagar railway station near underpass.
Translate to English
Translate to Hindi

More Posts
Rail Fanning
58775 views
3

Oct 19 2021 (16:50)   TPNR/Transport Nagar (Lucknow) (1 PFs)
kirk782~   220 blog posts
Entry# 5098712            Tags   Past Edits
Where the Tracks have no name
Translate to English
Translate to Hindi
Rail Fanning
57453 views
6

Jan 26 2021 (16:53)   TPNR/Transport Nagar (Lucknow) (1 PFs) | LKO/WDG-3A/13385
kirk781~   3537 blog posts
Entry# 4857403            Tags   Past Edits
Images taken at and around the station. The place is under construction since no platforms and/or tracks (except for the main line) or any other amenities were present. This is present on the Utratia-Alamnagar bypass section. It is currently only used by freight trains but with furthur development of station, some trains coming from UTR side and going towards Moradabad will use it as well. The station is 8 km from Utratia Junction.

In the images, one can see the works going on including laying of tracks. Tracks heading out of the
...
more...
station towards UTR can be seen in the last image. There is also an image where cutting of track via machine is being done.

Translate to English
Translate to Hindi

More Posts
Page#    Showing 6 to 10 of 24 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy