Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sat Apr 20 01:52:02 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Advanced Search
<<prev entry    next entry>>
News Entry# 449815
Apr 26 2021 (19:27) लखनऊ में चार ऑक्सीजन टैंकर के साथ आई Oxygen Express, बोकारो से पहुंची 17 घंटे में (m.jagran.com)
New/Special Trains
NR/Northern
36971 views
2

News Entry# 449815   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Lucknow Charbagh NR/LKO  
लखनऊ, जेएनएन। ऑक्सीजन की किल्लत के बीच सोमवार को एक उस समय राहत मिली जब बोकारो से चली एक ऑक्सीजन एक्सप्रेस लखनऊ आ गई। बोकारो से चार...

6 Posts

18632 views
2

Apr 26 2021 (19:44)
Arnab_K~
Arnab_K~   9041 blog posts
Re# 4948221-7              
Diesel Locomotives are more reliable (self sufficient). Most important trains/accidental relief trains are hauled by diesel.
In case of any OHE failure, a D loco train won't be affected much.
Furthermore if there is a path diversion required, a D loco hauled train is unaffected by the route (FEDL/FESL/FDDL/FDSL routes). And considering the priority this trains are allocated, it is a good thing , they are hauled by Diesel.
Translate to English
Translate to Hindi

18973 views
2

Apr 26 2021 (21:44)
SaurabhDubey^~
SaurabhDubey^~   30229 blog posts
Re# 4948221-8               Past Edits
Because they want to rule out any delay due to ohe line fault or tripping problem in case of wind storm or tree falling over tracks.
Also, mps of this tanker rake is just 65 km/h which at max can cross 70-75 km/h, so dloco can easily perform the task with out any extra time delay
Translate to English
Translate to Hindi

19996 views
2

Apr 26 2021 (22:52)
Ben_Kenobi~
Ben_Kenobi~   4222 blog posts
Re# 4948221-9              
Because diesel zindabad tha, zindabad hai aur zindabad rahega :p
Jk, electric loco ka shayaad availability nahi rahega as many trains are being operated towards north, same being the issue with e loco crew.
There are other issues, most notably with height of OHE and top of tanker being quite close and no earthing being done between tanker body and rails, but if that was the main issue they would have taken non electrified route outwards.
Translate to English
Translate to Hindi

General Travel
15313 views
0

Apr 27 2021 (08:45)
RaghavBZU12621
RaghavBZU12621   386 blog posts
Re# 4948221-10              
so this is howrah rajdhani of ~80s 😜, DUW
Posted thru Follow my Trip
Translate to English
Translate to Hindi

1 Posts

9992 views
2

Apr 28 2021 (14:19)
Ben_Kenobi~
Ben_Kenobi~   4222 blog posts
Re# 4948221-12              
"OHE power block demaned 2.00hrs, but traffic power block given 13.05-14.35hrs for OHE height increasing for Oxygen spl passing between Niwar-Katni South, Power block cancelled at 14.50hrs. Major Section: JBP-KTE, Minor/Sec-SBD-KTES"

As mentioned above there is issue with OHE height and the risk of arcing and subsequent explosion as the tanker passes very close to overhead wire in certain areas. Having diesel loco helps in this case.
But
...
more...
I still say, diesel loco zindabad hai abhi bhi :p

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy