So once the Chandrauli - Adheenpur Route Length of 58.66 km is doubled (and electrified too) then the entire route may become fit to speed up LHB trains like Durgiana Express. If the MPS becomes something between 115 to 120 Kmph then the travel time between BSB and LKO via SLN should come down to 4.5 to 5 Hours. Right? :)
#TrackReforms