Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Aug 17 09:29:09 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Description/Uses/Merits of this ΣChain
Travel Time: 55h 55m 38 halts Distance: 2044 km 1 xfers

25487/Σ (dep Sun arr Wed) AJE-ST-SBC ΣChain


Created: Feb 02 2020 (13:00) by KishorWhoAJE2here~

Change Departure Station:
Change Arrival Station:

00
PNR    Forum    Time-Table    Availability    Fare Chart    Trips    Gallery    

ΣChain Blog

Page#    Showing 11 to 15 of 575 blog entries  <<prev  next>>
Info Update
121751 views
0

Mar 10 (00:45)   20907/Sayaji Nagari Superfast Express (PT) | BHUJ/Bhuj (3 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   534 blog posts
Entry# 5992491            Tags   Past Edits
Railways should make rake sharing arrangements or rsa of these both trains ( 20907/08 Bhuj Dadar Western Sayaji Nagari Express and 22955/56 Bandra Terminus Bhuj Kutch Express ) with each other so that a daily slot of primary maintenance or secondary maintenance will get emptied for extra or other new trains at Bhuj station and primary maintenance of 2+2 = 4 rakes of both trains can be done in 1 daily slot (for example Jaipur Bhopal and Jaipur asarva express also have 4 rakes and primary maintenance is done at Jaipur jn of 4 rakes train in only 1 daily slot at Jaipur jn ) Bhuj instead of 2 different slots.
Translate to English
Translate to Hindi

More Posts
Rail Fanning
39960 views
1

Feb 03 (12:26)   22956/Kutch SF Express (PT) | MDD/Malad (4 PFs)
HemangMankad~
HemangMankad~   1165 blog posts
Entry# 5959998            Tags  
1 compliments
Great
22956 Kutch express with Amul livery BRCE WAP 5 #30052 skips Malad from 5th line.
Translate to English
Translate to Hindi

More Posts
Rail Fanning
222037 views
17

★★
Nov 29 2023 (09:05)   16531/Ajmer - KSR Bengaluru Garib Nawaz Express (PT) | BYC/Ballari Cantt. Halt (Bellary) (2 PFs)
SteelCityRF^~
SteelCityRF^~   27715 blog posts
Entry# 5896429            Tags   Past Edits
6 compliments
Great Great Great Great Great Great
16531 - Ajmer - KSR Bengaluru Garib Nawaz Express skipping #Ballari Cantonment Halt on #November28th2023 i.e., Yesterday

This train was hauled by Krishnarajapuram (KJMD) WAG-9HC #41537

Enjoy electric loco horn
...
more...


Please subscribe, like, comment and share

#SteelCityRF

Video and picture source: Self

Translate to English
Translate to Hindi

8 Posts

127912 views
0

Dec 01 2023 (10:42)
Asis~   1012 blog posts
Re# 5896429-9              
During detail engineering, requirement of TSS and its location might have defined based on the load...
Translate to English
Translate to Hindi

137155 views
0

Dec 01 2023 (12:50)
SteelCityRF^~
SteelCityRF^~   27715 blog posts
Re# 5896429-10              
TSS locations have been fixed during electrification itself

But construction and energisation of some TSS have not been completed till date. That is the problem
Translate to English
Translate to Hindi

125975 views
1

Dec 01 2023 (13:01)
Asis~   1012 blog posts
Re# 5896429-11              
1 compliments
Agree
Construction and energisation of TSS fall under whose scope ; Railway or RVNL / IRCON/ CORE or contractors..
Translate to English
Translate to Hindi

126514 views
0

Dec 02 2023 (09:44)guest
Re# 5896429-12              
surbari halvad electrification crs date please update anis bhai
Translate to English
Translate to Hindi

129247 views
0

Dec 02 2023 (09:46)guest
Re# 5896429-13              
@5896429-12  @guest
Bhildi jalor railway line electrification CRS Date please share date anis bhai
Translate to English
Translate to Hindi
General Travel
25841 views
1

Jan 11 (19:36)   22956/Kutch SF Express (PT) | BHUJ/Bhuj (3 PFs)
ubhay43
ubhay43   1 blog posts
Entry# 5938997            Tags   Past Edits
Now on fully electric run from bhuj to bdts
Translate to English
Translate to Hindi

23307 views
0

Jan 11 (22:10)guest
Re# 5938997-1               Past Edits
Loco BRC/WAP-7 bhuj bdts train please update
Translate to English
Translate to Hindi
0
updating ...
3 wishes
Forever MPS Happy Journey Happy Journey sir
Done with my work at Mumbai. Came to Mumbai by road. Next up to Delhi in phases. Leg 1 to Ahmedabad in my fav Shatabdi.

78 Posts

FmtBlog
23583 views
0

Jan 10 (08:37)
DrSwaroop^~
DrSwaroop^~   110915 blog posts
Re# 5937124-79            Tags  
@ATUL   15m late
@ATUL: Atul &93 km/h #22956: Kutch SF Express crossed
Translate to English
Translate to Hindi

More Posts
Page#    Showing 11 to 15 of 575 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy