Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon May 6 15:31:58 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Page#    5 Blog Entries  
Rail Fanning
87609 views
20

★★★
Apr 27 2015 (12:39)  
 
Rfchannel121~
Rfchannel121~   5279 blog posts
Entry# 1444163               Past Edits
#locopedia #technical
POH, IOH MOH and AOH of various electrical locomotives in Indian Railways
.
WAP-1/WAM-4/WCAM-1, 2, 3/WCAG-1/WCG-2/WCM-6
Trip Inspection: 3000kms or 1trip (whichever later)
AOH:
...
more...
12 months + 15 days ( duration is
6 working days)
IOH: 36 months + 1 month or 4 lakh kms (6 lakh for WAP-1 loco) whichever is earlier.(duration is 9 working days)
POH:6 years + 3 months or 8 lakh kms (12 lakh for WAP-1 loco) whichever earlier (duration is 24 days)
.
WAP4
.
Trip inspection :After 3000 kms or one trip whichever later.
AOH: 18 months + 15 days (duration is 6 days)
IOH: 36 months + 1 month or 6 lakh kms whichever earlier.(duration is 9 days)
POH: 6 years + 3 months or 12 lakh kms whichever is earlier. (24 working days)
.
WAG5 (fit with TAO traction motors)
.
Trip inspection: 15 days
AOH: 18 months + 10 days (Duration 6 days)
IOH: 54 months + 1 month or 6 lakh kms whichever earlier. (duration is 9 days)
POH: 9 years + 3 months or 12 lakh kms whichever is earlier. (duration is 28 days)
.
WAG-5 (TAOchi variant), WAG-5H & WAG-7 locos
.
Trip inspection: 20 days
AOH: 18 months + 10 days ( duration 6 days
IOH: 54 months + 1 month or 6 lakh kms whichever is earlier.(duration 9 days)
POH: 9 years + 3 months or 12 lakh kms whichever is earlier(duration is 28 days)
.
3phasers:
.
WAP5/WAP7 locos
.
Trip inspection: 3000 kms or one trip, whichever is later
MOH:18 months (Duration 6 days)
IOH: 4.5 years + 6 months or 12 lakh kms. whichever earlier.
duration
WAP-7 - 11 days
WAP-5 - 20 days
POH: 9 years + 6 months or 24 lakh kms. whichever earlier.
Duration 28 days
.
WAG 9/9H (including i variants)
.
Trip inspection: 45 days
MOH: 18 months( Duration 6 working days / 8 working days for 2nd MOH)
IOH:6 years + 6 months or 12 lakh kms. whichever is earlier.(duration 11 days)
POH: 12 years + 6 months or 24 lakh kms. whichever is earlier. (Duration 28 days)
AOH:Annual Over Haul
IOH:Intermediate Over Haul
MOH:Maintenance Over Haul
POH:Periodic Over Haul
2nd MOH takes more time because additional tasks are performed in 2nd MOH
Suggest corrections if needed
Source:
RDSO Page

Translate to English
Translate to Hindi

4 Public Posts - Mon Apr 27, 2015
Rail Fanning
17540 views
2

Sep 18 2014 (10:43)  
 
guest   3263 blog posts
Entry# 1217701               Past Edits
WAP7 vs WDP4 on quota
click here
You can also add your own answer to this site it has to be detailed and some proofs should be there to support it
#techstuff #locopedia
Translate to English
Translate to Hindi

6 Public Posts - Thu Sep 18, 2014
Rail Fanning
13058 views
4

Jul 20 2014 (10:32)  
 
Anonymous1218~
Anonymous1218~   22543 blog posts
Entry# 1166954              
#Locopedia #TechStuffs
Brief Details regarding the basics n working of a Microprocessor in
locomotives., issued by RDSO, Lucknow.
Anyone interested to read it, please download n have a look.
Thank You
...
more...

Translate to English
Translate to Hindi

5 Public Posts - Sun Jul 20, 2014
Rail Fanning
11051 views
6

Jun 07 2014 (19:50)  
 
Anonymous1218~
Anonymous1218~   22543 blog posts
Entry# 1127118              
#Locopedia
-
Ex-New Haven EMD FL-9 diesel electric locomotive # 2006 at Danbury Railway Museum, Danbury, Connecticut, USA
Date:- 08-04-2006
Photographer:- Mike Powell
For
...
more...
pic:- EMD FL9
For Specs:- For new learners
Loco Name:- EMD FL9 [Electro-Diesel Locomotive]
Loco Weight:- 130 T
Transmission:- 660 V DC (3rd Rail) using Shoe contacts
Prime Mover:- EMD 567C
Speed:- 89 mph (143 km/h)
Power Output:- 1750 hp
Tractive Effort:- 258 kN

Translate to English
Translate to Hindi

2 Public Posts - Sat Jun 07, 2014
2 Followers
Rail Fanning
14318 views
15

May 14 2014 (21:16)  
 
Anonymous1218~
Anonymous1218~   22543 blog posts
Entry# 1097321               Past Edits
#Locopedia
-------------------------------
Just for knowledge of New ones out there.
Though the info is available in some sites, but approx figures will b given.
-
Diesel
...
more...
Locos:-
-
WDM-2
W:- 113 T
TE:- 298 kN
-
WDM-3A
W:- 113 T
TE:- 298 kN
-
WDM-3D
W:- 117 T
TE:- 353 kN
-
WDG-3A
W:- 123 T
TE:- 371 kN
-
WDP-1
W:- 80 T
TE:- 196 kN
-
WDP-2/WDP-3A
W:- 117 T
TE:- 191 kN
------
Here W stands for Weight, T for Tonnes and kN for Kilo Newtons
The details of only present active locos which are in service.
The list of Diesel is posted. Next will be Electric Diesel's aka Electromotive Diesels list.

Translate to English
Translate to Hindi

8972 views
0

May 14 2014 (21:32)
Anonymous1218~
Anonymous1218~   22543 blog posts
Re# 1097321-1              
#Locopedia
Diesel Electric Locomotives aka the Electromotive Diesels
-
WDP-4
W:- 119 T
TE:-
...
more...
269 kN
-
WDP-4B
W:- 122 T
TE:- 384 kN
-
WDP-4D
W:-
TE:- 399 kN
-
WDG-4
W:- 126 T
TE:- 540 kN
-
WDG-4D
W:-
TE:- 536 kN
-
WDG-5
W:-
TE:- 560 kN
---
The info of WDP-4D, WDG-4D and WDG-5 are still pending.
IF anyone has info, please lemme know. :-)

Translate to English
Translate to Hindi

8762 views
0

May 15 2014 (08:26)
Anonymous1218~
Anonymous1218~   22543 blog posts
Re# 1097321-2              
#Locopedia
-
Electric Locos, which are presently active.
-
WAM-4
W:-
...
more...
113 T
TE:- 331 kN
-
WCAM-1
W:- 113 T
TE:- 276 kN (DC), 331 kN (AC)
-
WCAM-2
W:- 113 T
TE:- 254 kN (DC), 327 kN (AC)
-
WCAM-3
W:- 113 T
TE:- 254 kN (DC), 327 kN (AC)
-
WCAG-1
W:- 128 T
TE:- 290 kN (DC), 426 kN (AC)
-
WAP-1
W:- 112 T
TE:- 219 T
-
WAP-4
W:- 113 T
TE:- 302 kN
-
WAP-5
W:- 79 T
TE:- 257 kN
-
WAP-7
W:- 123 T
TE:- 353 T
-
WAG-5
W:- 119 T
TE:- 328 kN
-
WAG-7
W:- 123 T
TE:- 402 kN
-
WAG-9
W:- 123 T
TE:- 459 kN
-
WAG-9H
W:- 135 T
TE:- 509 kN
-
WAG-6A
W:- 123 T
TE:- 440T
-
WAG-6B
W:- 123 T
TE:- 440 kN
-
WAG-6C
W:- 123 T
TE:- 440 kN
-----------------
Most of Rail fans love to compare their powers, their speed.
Speed isn't mentioned in any of these updates for now.
Only the weight n the Tractive Effort (Axle Load) is updated.
So now on a Rail fan or a newcomer can understand how much can a locomotive can haul, let it be passenger based or a freight based locos.
-
Any extra info, or updates are welcomed here.
-
P.S:- this is just for knowledge for rail fans n new comers out there.

Translate to English
Translate to Hindi

10 Public Posts - Thu May 15, 2014
Page#    5 Blog Entries  

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3619297 ★★★ 378HBR~
1870067 ★★★ 223GondwanaExpress^~
3242050 ★★★ 349~
5257556 ★★★ 133jishnuthakur12301^...

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy